Cambridge Phase 1-LR 941104 (3)I G EOTECHNICAL
E GEE Consultants, Inc.
E
N\.'IRON~ 4ENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214i 620-9791 · Fax ('214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 4, 1994 Date Concrete Placed: October 6, 1994 Standard 6"x12'
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 23
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete/On Site
Location of Placement: Cambridge Manor Lane Pavement
MATERIALS s~-~- ss~.,~aw~. INSPECTION DATA
D~ription (Lb6 CuYd~
Mix Number: Time Sample Batched: 2:05 pin
Cement: Time Sampled: 2:15 pm
Sample Location: Station 5 + 70
Fly Ash: Track,Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 81 °F
Fine Aggregate: Concrete Range: 80°F
Admixtures: Slump Range (inches): 2:..'2
Weather Conditions: Parry Cloudy. Windy
I Time Started: 8:15 am
2 Time Completed: 5:45 pm
Added Water: Sample Air Content (%): 4.5
Total Cubic Yards Placed:
Required Strength (Lbs.fsq.in.): 3.000
Specir~n Measured Age Daw 'l'c~xi L,'~d Cert',pre~six'~ Strength
N ut:'./ze r S:ump IL'a.} ,'Days! 'l-est~l ,[.M.) !Lbs. 'Sq.ind
ECM 75 2½ 7 10/13/94 100,160 3,540
ECM 76 2½ 7 10/13/94 97,600 3,450
ECM 77 2% 28 11/03/94 110,500 3,910
ECM 78 2½ 28 11/03/94 116,420 4,120
Te~t \l¢~ods Uti?~l Frac!u~ Regular
ASTM C-31.C-3-),C-i.:3 -Unless Nc.ed o,.~v,.-~) Cylinders Made By: R. G.
Remarks and/or Distribution:
cc: Bill Anderson - Dowdy, Anderson and Assuciates, Inc.
Larry Davis - City of Coppell
(~EE Consultants, Inc. Reviewed by: ~$'~/)
AB letters md repor.$ are for ~ excl~.~ive u~ of tl~ client to ~.hom 'd~.. ar~ add~cl anc~ sha;I not be neproduced withe~t '.M: 1~1 apg. royal of GEE Corauhants, l~c. Th~ ~ of cur narc~ rn'~t re~.~eive
our prior v.-rltten app~.'al. Our leltera -,md ~por'.s a.~. ly ~y to ,..he sam~ie te. sl~i a~t.'or k-~gcct~d a.-gi am ant re.x:essarily indicatg~e of ~ w. aami:ie.s of appa~emly identical or sirrA:a_-'