Cambridge Phase 1-LR 941104 (4) G E
OTECHNICAL
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · i2141 620-9791 · Fax ~214~ 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 4, 1994 Date Concrete Placed: October 6, 1994 Standard 6"xl?
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Coocrete Report No.: 22
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete/On Site
Location of Placement: Kings Canyon Court
s~.- ss~ ~.~w.~. INSPECTION DATA
MATERIALS ~.~i~= ,t.~.-c.v~,
Mix Number: Time Sample Batched:
Cement: Time Sampled: ! 1:38 am
Sample Location: Station 1 ~50
Fly Ash: Truck.Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range:
Fine Aggregate: Concrete Range: 80°F
Slump Range (inches): 2~.":
Admixtures: Weather Conditions: Partly Cloudy
I Time Started: 8:15 am
2 Time Completed: 5:45 pln
Added Water: Sample Air Content (G):
Total Cubic Yards Placed:
Required Strength (Lbs.:sq.ht.i: 3.000
ECM 71 2½ 7 10/13/94 93,940 3,320
ECM 72 2~ 7 10/13/94 87,160 3,080
ECM 73 2½ 28 11/03/94 112,080 3,960
ECM 74 2½ 28 11/03/94 100,560 3,560
ASq'M C-3hC-39.C-143 :L'v2ess .xeu:a Oe,,e~-;_~; Cylinders Made By: G. H.
Remarks and/or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates, Inc.
Larry. Davis - City of Coppell
6EE Consultants, Inc. Reviewed by:
Al! h:t,.cvz and rcpoz~s a~ for ~ cxclosb.'e me e-f t. he cti~m to 'a. hom t.h~., am adfl..~ssed and _~all no~ be repr~"~c~ ,.vit.hout ',he F~I al:~'rtwal of GEE Consuh..was. Inc.. T~ ~ of .~ur ."varec must .-eec[ye