Loading...
Cambridge Phase 1-LR 941104 (4) G E OTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · i2141 620-9791 · Fax ~214~ 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 4, 1994 Date Concrete Placed: October 6, 1994 Standard 6"xl? Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Coocrete Report No.: 22 Contractor: Site Concrete Concrete Supplier and Plant: Site Concrete/On Site Location of Placement: Kings Canyon Court s~.- ss~ ~.~w.~. INSPECTION DATA MATERIALS ~.~i~= ,t.~.-c.v~, Mix Number: Time Sample Batched: Cement: Time Sampled: ! 1:38 am Sample Location: Station 1 ~50 Fly Ash: Truck.Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: Fine Aggregate: Concrete Range: 80°F Slump Range (inches): 2~.": Admixtures: Weather Conditions: Partly Cloudy I Time Started: 8:15 am 2 Time Completed: 5:45 pln Added Water: Sample Air Content (G): Total Cubic Yards Placed: Required Strength (Lbs.:sq.ht.i: 3.000 ECM 71 2½ 7 10/13/94 93,940 3,320 ECM 72 2~ 7 10/13/94 87,160 3,080 ECM 73 2½ 28 11/03/94 112,080 3,960 ECM 74 2½ 28 11/03/94 100,560 3,560 ASq'M C-3hC-39.C-143 :L'v2ess .xeu:a Oe,,e~-;_~; Cylinders Made By: G. H. Remarks and/or Distribution: cc: Bill Anderson - Dowdy. Anderson and Associates, Inc. Larry. Davis - City of Coppell 6EE Consultants, Inc. Reviewed by: Al! h:t,.cvz and rcpoz~s a~ for ~ cxclosb.'e me e-f t. he cti~m to 'a. hom t.h~., am adfl..~ssed and _~all no~ be repr~"~c~ ,.vit.hout ',he F~I al:~'rtwal of GEE Consuh..was. Inc.. T~ ~ of .~ur ."varec must .-eec[ye