Cambridge Phase 1-LR 941104 (5) G F
OTECHNICAL
E NGi.\EERING GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214:, 620-9791 · Fax t214., 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 4, 1994 Date Concrete Placed: October 6, 1994 Standard 6"x12~
CLient: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete Report No.: 21
Contractor: Site Concrete
Concrete Suppiier and Plato; Site Concrete/On Site
Location of Placement: Cambridge Manor Lane Pavement
s .... ssD ~.:.hW~. INSPECTION DATA
MAT ER IAL S ~,~,i~,~ ,'t.~-c~v~,
Mix Number: Time Sample Batched: aln
Cement: Time Sampled: 9:50 ant
Sample Location: Station 8+20
Fly Ash: Tmck.'Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 70°F
Concrete Range: 80¢F
Fine Aggregate: Slump Range {inches): 2:/:
Admixtures: Weather Conditions: Cloudy
I Time Started: 8:15 am
2 Time Completed: 5:45 pm
Added Water: Sample Air Content (%): 3.0~
Total Cubic Yards Placed:
Required Strength (Lbs.:sq.in.): 3.000
S~cixmn Mea~urext Age Da'~ Tote: Lc~.~ C~m....-,~ s s~x'e
Number Slia~.p !in.. ~ IDa, s: Tes,.e.d ~L~. ~ ,'L~. Sq.ln.
ECM 67 2½ 7 10/13/94 92,380 3,270
ECM 68 2½ 7 10/13/94 100,660 3,560
ECM 69 2½ 28 11/03/94 123,420 4,370
ECM 70 2½ 28 11/03/94 117,460 4,150
Tes, M¢fl'.od$ L':iiLzed Fractu.~ Regular Cvlinder~ Made By: G.
ASTM C-31,C-3~,C-1-13 ,Unie.ss Noted Otbgrv,-iz) ' ' ~' *
Remarks and/or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates. Inc.
LarD.' Davis - City of Coppell
~,~ ~$ult~t8, I,~c. Reviewed by:
All lett~m and reports an: for the exclmiv¢ u,~ of ~ client to whom ,J~y an: addrrased and shall not .he mprodu,..~d wit,hour the full aggro','a; of GEE Coc..5ulpants. Lac. T'ne: ~ of c.u: na_.'r~ mu~t t~xlve