Loading...
Cambridge Phase 1-LR 941103 GEOTECH×ICAL GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas. Texa~ 75229 · ,"~ 14i.;. 620-9791 · Fax ,.:"~14~ 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 3, 1994 Date Concrete Placed: October 26, 1994 Standard 6"x12" Client: Beamer Development Corporation Area'~_8..:~''' Square' Inches Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 33 Contractor: Gr i f f ith Con s~ruct ion Concrete Supplier and Plant: Lattimore Plant #7 Location of Placement: Storm Drain Inlet Leave Out s .... SSD,.,thw'.~. INSPECTION DATA MATER IAL S De~iption Mix Number: 38 Time Sample Batched: 2:31 pm Cement: 5.0 s.k. Time Sampled: .3:17 pm Sample Location: E. side of Castle Creek Drive FI)' Ash: Truck/Ticket No: 456.'700513 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 66:F Fine Aggregate: Concrete Range: 67'F Slump Range jnchesi Admixtures: Weather Conditions: Partly Cloudy I W.:R Time Started: 2:45 pm 2 Air Time Completed: 4:25 pm Added Water: 5 gal Sample Air Content (':~): No te~t Total Cubic Yards Placed: 5.5 CY Required Strength (Lbs..:sq.in.): 3.000 ECM 121 4½ 7 11/02/94 89,220 3,160 ECM 122 4½ 28 11/23/94 ECM 123 4½ 28 11/23/94 Tes~ Metb~-xts Ut~lhed Fracttc~e Regular Cx'linders Made By: a. G. AS'TM C-31 ,C-39.C-:..13 :l..'v'.~ss No'.ed O'~ne.~.isc{ - - Remarks and:or Distribution: cc: Bill Anderson - Dowdy. Anderson and Associates. Inc. Larry Davis - City of Copp¢ll