Cambridge Phase 1-LR 941103 GEOTECH×ICAL
GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas. Texa~ 75229 · ,"~ 14i.;. 620-9791 · Fax ,.:"~14~ 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 3, 1994 Date Concrete Placed: October 26, 1994 Standard 6"x12"
Client: Beamer Development Corporation Area'~_8..:~''' Square' Inches
Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 33
Contractor: Gr i f f ith Con s~ruct ion
Concrete Supplier and Plant: Lattimore Plant #7
Location of Placement: Storm Drain Inlet Leave Out
s .... SSD,.,thw'.~. INSPECTION DATA
MATER IAL S De~iption
Mix Number: 38 Time Sample Batched: 2:31 pm
Cement: 5.0 s.k. Time Sampled: .3:17 pm
Sample Location: E. side of Castle Creek Drive
FI)' Ash: Truck/Ticket No: 456.'700513
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 66:F
Fine Aggregate: Concrete Range: 67'F
Slump Range jnchesi
Admixtures: Weather Conditions: Partly Cloudy
I W.:R Time Started: 2:45 pm
2 Air Time Completed: 4:25 pm
Added Water: 5 gal Sample Air Content (':~): No te~t
Total Cubic Yards Placed: 5.5 CY
Required Strength (Lbs..:sq.in.): 3.000
ECM 121 4½ 7 11/02/94 89,220 3,160
ECM 122 4½ 28 11/23/94
ECM 123 4½ 28 11/23/94
Tes~ Metb~-xts Ut~lhed Fracttc~e Regular Cx'linders Made By: a. G.
AS'TM C-31 ,C-39.C-:..13 :l..'v'.~ss No'.ed O'~ne.~.isc{ - -
Remarks and:or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates. Inc.
Larry Davis - City of Copp¢ll