Cambridge Phase 1-LR 941103 (2) G E
OTECHNICAL
GEl: Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · ~214! 620-9791 · Fax f214.~ 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 3, 1994 Date Concrete Placed: October 26, 1994 Standard 6"x12"
Client: Beamer Development Corporation Area !8.17Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 32
Contractor: Griffith Construction
Concrete Supplier and Plant: Lattimore Materials #3
Location of Placement: Storm Drain Inlet Leave Out
MATERIALS sc=,~ ssD,~,.+.w,,. INSPECTION DATA
D,:scrip;ion (L~-'CuYd)
Mix Number: 38 Time Sample Berthed: 9:48 am
Cement: 5.0 s.k. Time Sampled: 10:26 am
Fl)' Ash: Sample Location: N. end of Cambridge Manor Lane. E. side
Truck:Ticket No: 300:3003 t0
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 65°F
Fine Aggregate: Con~rete Range: 66°F
Admixtures: Slump Range (inches): 2;,.'~.
Weather Conditions: Partly Cloudy
I W.'R Time Started: 9:30 am
2 Air Time Completed: 11:30 am
Added Water: Sample Air Content (~): No test
Total Cubic Yards Placed: 10 CY
Required Strength ~Lbs..-'sq. n ): 3.000
Spe~-qraer, Meas,.tred Age D'at~ Te~ai Loa~ C:,mpre..~:q,a: St.~ng!k
Remarks
Numl~r Sl ,amp :Ln.~ , ly. Lvs: Tcst~x~ .L~.: L~.
ECM 118 2½ 7 11/02/94 115,940 4,100
ECM 119 2½ 28 11/23/94
ECM 120 2% 28 11/23/94
ASTM C-3:.C-39.C-143 :t.'r. less :q,',~d o:~r~.~ C}linders Made By: R. G.
Remarks and."or Distribution:
Bill Anderson - Dowd.v. Anderson and Associates. Inc.
Larry Davis - City of Coppell
~EIg Consultants, Inc. Reviewed by: ..-~~
All }tiara and r~p~..'ts ar~ for Lhe exclm[',~ ~ of 'J~ client to ,.,,horn L~_v am add~r..ssed and sl-,al! r~ b~ ~?rc~ta:~d ,.,. ?.hour '.2"~ ~.all aFp~".al of GEE Cor~uha.nts. Lac.