Cambridge Phase 1-LR 941103 (3)G EOTECHNICAL
ENGINEERING GEE Consultants, Inc.
E ] NVIRONMENTAL
2540 Gienda Lane · Suite 108 · Dallas, Texas 75229 · (214~ 620-9791 · Fax (214'., 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 3, 1994 Date Concrete Placed: October 5, 1994 Standard 6"x12"
Client: Beamer Development Corporation Area 2g.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete Report No.: 19
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete/On-Site
Location of Placement: Cambridge Manor Lane Pavement
so.,~.- SSD .,~w.. INSPECTION DATA
MATERIALS Dc .,.'rig io~ ,'L~.C~¥dl
Mix Number: Time Sample Batched: 4:25 pm
Cement: Time Sampled: 4:35 pm
Sample Location:
Fly Ash: Truck/Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 92°F
Fine A£gregate: Concrete Range: °F
~ Slump Range (inches):
Admixtures: Weather Conditions: Clear
I Time Started: 6:45 am
2 Time Completed: 5:00 pm
Added Water: Sample Air Content (2): No test
Total Cubic Yards Placed: 750.0
Required Strength (Lbs.,'sq.in.): 3,000
Sp~c:,n~n Measured Ase Date Tota[ Load Comp.~siv¢ S'.reng~ Rcm..ari~
Nt~nber Sltmap dn.~ :'Days! Tcs~d ,'Lha.~ :Lba. Sq.ln.i
ECM 59 2¼ 7 10/12/94 55,700 1,970
ECS 60 2¼ 7 10/12/94 70,100 2,480
ECS 61 2¼ 28 11/02/94 99,980 3,540
ECS 62 2¼ 28 11/02/94 102,740 3,630
Test Mcth~d~ t'tiihed Fmcxtu~ Rcgu;ar Cylinders Made By: P o M ·
ASTM C-31.C-39,C-;.:3 !Unle.qs Nc~d Od~.'x~:.~! ' '
Remarks and:or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates. Inc.
Larry. Davis - City of Coppell
Gi~ Coyis'u. lgalxgs, IllC. Reviewed by: ///'
All k~tmrs and m. porl.~ am for tl~ cxclusb.~ ua* of the client to whom ',.hey am addnamed and shall nth he .~p..-odu~xl without the ~11 .aggn~.'al of GEE Cov, aui'.an',s, Inc. Th~ a.,m of cur ram* rn~t ~at lytior written a.l~n~.'al. Out kaers and rq~o~ appb.' only to the ~mpi~ leered and.'m' im.tw, c~[ and aR ncr nm~ssariiy ;~ticativ¢ of '.~ quanlitie~ of aplmmntly ;.~ntical er sinai;ar