Cambridge Phase 1-LR 941103 (4)I GEOTECHNICAL
E GEE Consultants, Inc.
E I
2540 Glenda lane · Suite 10g · Dallas. lexas 75229 · {214) 620-9791 · [ax ,'214> 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 3, 1994 Date Concrete Placed: October 5, 1994 Standard 6'x12"
Client: Beamer Development Corporation Area !8.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete Repo~ No.: 18
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete/On-Site
Location of Placement: Cambridge Manor Lane Pavement
MATERIALS s~=.' ~v ..,ch w~.
~,~i~i~ .:L~.oJYa, INSPECTION DATA
Mix Number: Time Sample Batched: 2:25 pin
Cement: Time Sampled: 2:35 pm
Fly Ash: Sample Location: At comer
Tru,~k,"ri¢ ket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 90°F
Fine Aggregate: Concrete Range:
Admixtures: Slump Range (inches): 4!,6
Weather Conditions: Clear
I Time Started: 6:45 am
'~ Time Completed: 5:00 pm
Added Water: Sample Air Content (~): No test
Total Cubic Yards Placed: 600.0
Required Strength (Lbs.:sq.in.): 3,000
Spoci~n Meaaured Agg Dam Total Load C~nnp~sixc S~mv.~t.%
Numbe. r Sluing dn.I ~Da:,s; T~.d .Lbs.' tL~. Sq.ln.I
ECM 55 4½ 7 10/12/94 78,500 2,780
ECM 56 4½ 7 10/12/94 84,080 2,970
ECM 57 4½ 28 11/02/94 96,560 3,420
ECM 58 4½ 28 11/02/94 90,040 3,190
Te$~ Mctho~ tfilizod F."ac~.um Regular
ASTM C-31.C-39.CC43 :L:r'-;es~ S.~ Ou~r,,'i~ Cylinders Made By: P. M.
Remarks and/or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates. Inc.
Larry Davis - City of Coppell ~//~ ~
~ Coasultants, lac. Reviewed by: Y~ff/~
AH I~ttav~ and mpov..$ am for tl~ ex¢lmi'~ a~: of the cliera to whom ~ am addr~d and shaU mn b¢ m-produc~l v.,itl,,o~ t}~ flail apl~o~al of GEE Comultam$. Inc. Th* u.~ of out ~ o~r prior writtrn approval. Our t-lt~r~ and mlx~,z apply only to th~ ~amph- ~,nlmi atxt.'or impc~od ard am no{ nm:cssat~.ly indicative of the quantities of app~r~mly identical or sLr~i'ar