Cambridge Phase 1-LR 941103 (5)I G EOTECHNICAL
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax !1214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 3, 1994 Date Concrete Placed: October 5, 1994 Standard 6'x12'
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete Repo~ No.: 17
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete/On-Site
Location of Placement: Cambridge Manor Lane Pavement
MATERIALS s~,.,.' ~D,~t~h w,,. INSPECTION DATA
Description ( D~. CuYd)
Mix Number: Time Sample Batched: I:00 pm
Cement: Time Sampled: 1:15 pm
Fly' Ash: Sample Location: Station 17-86
Track:Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 80°F
Fine Aggregate: Concrete Range: °F
Admixtures: Slump Range (inches): 3V:
Weather Conditions: Clear
1 Time Started: 6:45 am
2 Time Completed: 5:00 pm
Added Water: Sample Air Content (%): No test
Total Cubic Yards Placed: 450.0
Required Strength (Lbs.;sq.in.): 3.000
Specin:m~ .Me~.~uted Age Dat~ Tc~al Load Compmssix~
Re.ma.~ks
ECM 51 3½ 7 10/12/94 75,660 2,680
ECM 52 3½ 7 10/12/94 76,280 2,700
ECM 53 3½ 28 11/02/94 89,300 3,160
ECM 54 3½ 28 11/02/94 89,710 3,170
Test Methods Utiliz~ Frae?ate Reg.,,:ar
ASTM C-3l,C-39.C-1a3 :L'_-3ess ,xot~d Oc~.~i~, Cylinders Made By: P. M.
Remarks and,'or Distribution:
cc: Bill Anderson- Dowdy', Anderson and Associates. Inc.
Lan3.' Davis - City of Coppell
GEE Consultants, Inc. Reviewed by: /
All ktt~m and, reports a~ for tim exclusive use of the client to v. kxu they are ~titessed and shall r~ b~ relnXXiuo~l wiflao~ Ih~ ,~all a!ugeo~nd of GEE Cor~ui,.anls. Inc. Th: u~e of our na.-u~ must receive
~ prior ~,-ritlmm al~uval. O~' ietl~r~ a~d ~ ap~ly only to ~ ~mp~ ~d and/om, impe~'t~, and ~ not nr..~asatily indieatix, e of ~ qx.~iti~ of apparentl.~ identical of similar p.-~xiuc~.