Loading...
Cambridge Phase 1-LR 941103 (5)I G EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax !1214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 3, 1994 Date Concrete Placed: October 5, 1994 Standard 6'x12' Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Concrete Repo~ No.: 17 Contractor: Site Concrete Concrete Supplier and Plant: Site Concrete/On-Site Location of Placement: Cambridge Manor Lane Pavement MATERIALS s~,.,.' ~D,~t~h w,,. INSPECTION DATA Description ( D~. CuYd) Mix Number: Time Sample Batched: I:00 pm Cement: Time Sampled: 1:15 pm Fly' Ash: Sample Location: Station 17-86 Track:Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 80°F Fine Aggregate: Concrete Range: °F Admixtures: Slump Range (inches): 3V: Weather Conditions: Clear 1 Time Started: 6:45 am 2 Time Completed: 5:00 pm Added Water: Sample Air Content (%): No test Total Cubic Yards Placed: 450.0 Required Strength (Lbs.;sq.in.): 3.000 Specin:m~ .Me~.~uted Age Dat~ Tc~al Load Compmssix~ Re.ma.~ks ECM 51 3½ 7 10/12/94 75,660 2,680 ECM 52 3½ 7 10/12/94 76,280 2,700 ECM 53 3½ 28 11/02/94 89,300 3,160 ECM 54 3½ 28 11/02/94 89,710 3,170 Test Methods Utiliz~ Frae?ate Reg.,,:ar ASTM C-3l,C-39.C-1a3 :L'_-3ess ,xot~d Oc~.~i~, Cylinders Made By: P. M. Remarks and,'or Distribution: cc: Bill Anderson- Dowdy', Anderson and Associates. Inc. Lan3.' Davis - City of Coppell GEE Consultants, Inc. Reviewed by: / All ktt~m and, reports a~ for tim exclusive use of the client to v. kxu they are ~titessed and shall r~ b~ relnXXiuo~l wiflao~ Ih~ ,~all a!ugeo~nd of GEE Cor~ui,.anls. Inc. Th: u~e of our na.-u~ must receive ~ prior ~,-ritlmm al~uval. O~' ietl~r~ a~d ~ ap~ly only to ~ ~mp~ ~d and/om, impe~'t~, and ~ not nr..~asatily indieatix, e of ~ qx.~iti~ of apparentl.~ identical of similar p.-~xiuc~.