Cambridge Phase 1-LR 941103 (6)G EOTECHNICAL
E GEE Consultants, Inc.
EINVIRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax ~214i 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 3, 1994 Date Concrete Placed: October 5, 1994 Standard 6~x12'
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete Repon No.: 16
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete/On-Site
Location of Placement: Castle Creek Drive Pavement
~ ,L~..c~Y~: INSPECTION DATA
Mix Number: Time Sample Bat~hed: 10:50 am
Cement: 5 sk Time Sampled: 1 1:00 am
Fly Ash: Sample Location: Station 2 +00
Truck,Wicket No: #20
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 80°F
Fine Aggregate: Concrete Range: °F
Admixtures: Slump Range (inches): 2~
Weather Conditions: Clear
I Time Started: 6:45 am
2 Time Completed: 5:00 pm
Added Water: Sample Air Content (%): No test
Total Cubic Yards Placed: 300.0
Required Strength (Lbs./gq.in.): 3,000
S.t~c=-n~n Mcasu~d Age Da~ T~di La~ Cempressiv¢ Streng~
ECM 47 2½ 7 10/12/94 81,540 2,880
ECM 48 2% 7 10/12/94 55,540 1,960
ECM 49 2% 28 11/02/94 100,100 3,540
ECM 50 2% 28 11/02/94 99,960 3,540
T(~t Me',hods t ;tilLed Frd~,tu~ Reguhr
ASTM C-31 .C-39.C- i 43 ;I. al~s Ne~l Ot-~,~4~ ~ Cylindc rs %lade By: P. M.
Remarks and/or Distribution:
cc: Bill Anderson - Dowdy, Anderson and Associates. Inc.
LarQ' Davis - City of Coppcll
GE]I ~onsultants, Inc. Reviewed by: //~~.~
All I~tl~es and eepcn~ a~ for ~ cxclusi~ us~ of ~ client to whom tl~y a~ ackt~ssed a~t shall nc~ he r~procita:~l without t.h~ lull approval of GEE C~uitams, Inc. Th~ ~ of ~ur narn~ must ~c~iv~
amr prior ~-'ritmn apprcn'al. Our u. ttem and repo~ apply c~dy Io ~ sampk lealecl andSo~ it~,t~l and ar~ no~ ne~c~asariiy ind½cativ¢ of ~ quamities of a.~a~nt~y idertticai or simgar p~x~clucts.