Loading...
Cambridge Phase 1-LR 941103 (6)G EOTECHNICAL E GEE Consultants, Inc. EINVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax ~214i 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 3, 1994 Date Concrete Placed: October 5, 1994 Standard 6~x12' Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Concrete Repon No.: 16 Contractor: Site Concrete Concrete Supplier and Plant: Site Concrete/On-Site Location of Placement: Castle Creek Drive Pavement ~ ,L~..c~Y~: INSPECTION DATA Mix Number: Time Sample Bat~hed: 10:50 am Cement: 5 sk Time Sampled: 1 1:00 am Fly Ash: Sample Location: Station 2 +00 Truck,Wicket No: #20 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 80°F Fine Aggregate: Concrete Range: °F Admixtures: Slump Range (inches): 2~ Weather Conditions: Clear I Time Started: 6:45 am 2 Time Completed: 5:00 pm Added Water: Sample Air Content (%): No test Total Cubic Yards Placed: 300.0 Required Strength (Lbs./gq.in.): 3,000 S.t~c=-n~n Mcasu~d Age Da~ T~di La~ Cempressiv¢ Streng~ ECM 47 2½ 7 10/12/94 81,540 2,880 ECM 48 2% 7 10/12/94 55,540 1,960 ECM 49 2% 28 11/02/94 100,100 3,540 ECM 50 2% 28 11/02/94 99,960 3,540 T(~t Me',hods t ;tilLed Frd~,tu~ Reguhr ASTM C-31 .C-39.C- i 43 ;I. al~s Ne~l Ot-~,~4~ ~ Cylindc rs %lade By: P. M. Remarks and/or Distribution: cc: Bill Anderson - Dowdy, Anderson and Associates. Inc. LarQ' Davis - City of Coppcll GE]I ~onsultants, Inc. Reviewed by: //~~.~ All I~tl~es and eepcn~ a~ for ~ cxclusi~ us~ of ~ client to whom tl~y a~ ackt~ssed a~t shall nc~ he r~procita:~l without t.h~ lull approval of GEE C~uitams, Inc. Th~ ~ of ~ur narn~ must ~c~iv~ amr prior ~-'ritmn apprcn'al. Our u. ttem and repo~ apply c~dy Io ~ sampk lealecl andSo~ it~,t~l and ar~ no~ ne~c~asariiy ind½cativ¢ of ~ quamities of a.~a~nt~y idertticai or simgar p~x~clucts.