Loading...
Cambridge Phase 1-LR 941103 (7)IG EOTECHNICAL ENGINEERING GEE Consultants, Inc. E INVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214; 620-9791 · Fax (214.~ 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 3, 1994 Date Concr--'te Placed: October 5, 1994 Standard 6"x12' Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 15 Contractor: Site Concrete Concrete Supplier and Plant: Site Concrete/On-Site Location of Placement: Castle Creek Drive Pavement MATERIALS ~, ~D ..t~w~. INSPECTION DATA D*s~i. ptio~ (LI~.'CuYd) Mix Number: Time Sample Batched: 9:00 am Cement: 5 sk Time Sampled: 9:15 am Fly Ash: Sample Location: Station 5 ~-60 Truck, eric ket No: #20 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 75°F Fine Aggregate: Concrete Range: °F Admixtures: Slump Range (inches): 1~,';. Weather Conditions: Clear I Time Sta~ed: 6:45 am 2 Time Completed: 5:00 pm Added Water: Sample Air Content (.%): No test Total Cubic Yards Placed: 150.0 Requii'ed Strength (Lbs.;'sq.in.): 3.000 Sp~..-c~n Measu~e~ Age Da'~ Total ~ Comp~$i,,e Stteng'h Rem~cL's Ntumix:r $1um. p ,.in,...' ~l>a.~, Toss,al ~Lb~.l ;Lb~. S~.In.~ ECM 43 1½ 7 10/12/94 86,700 3,070 ECM 44 1½ 7 10/12/94 90,000 3,180 ECM 45 1½ 28 11/02/94 102,470 3,620 ECM 46 1% 28 11/02/94 105,290 3,720 Test Men-,ads U:i;ize6 Fractun: RegGat ASTM C-31.C-39.C-143 :l.'ni~ ~c,,~l O',he~q-~ Cylinders Made B.v: P. M. Remarks and/or Distribution: cc: Bill Anderson - Dowdy, Anderson and Associates, Inc. LarD.' Davis - City of Coppell Ail [ett~.~ and reports a~ for th~ exclu~iw a~ of t~ cllma to ~daom tl~>- om' i~'ior ~,'fitten a!~'o~al. Out ~t~es and regotts al~pl)' only to