Cambridge Phase 1-LR 941101 G EOTECHNICAL
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · ~214! 620-9791 · Fax (214~ 6_0-9.. 9-,
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 1, 1994 Date Concrete Placed: October 24, 1994 Standard 6"x12"
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase i Concre:eRcpo~No.: 31
Contractor: Grif fith Construction
Concrete Supplier and P~ant: Lattimore Materials #3
Location of Placement: Storm Drain Inlets
s,,,~. ~D B.L,~W~. INSPECTION DATA
MAT ER I AL S ~,,+.p,~o. ,L~.-C~Vd,
Mix Number: Time Sample Batched: 1 1:30 ant
Cement: 5.0 s.k. Time Sampled: 12:30 pnt
Sample Location: Castle Creek Drive (east side)
Fly Ash: Tmck:q'icket Nn: 285..'3007303
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 70°F
Fine Aggregate: Concrete Range: 68°F
Slump Range (inches): 7"
Admixtures: Weather Conditions: Hard Rain
1 AE Time Started: 11:40 am
2 Time Completed: 1:30 pm
Added Water: Sample Air Content (%]: 2.5~
Total Cubic Yards Placed: 10 CY
Required Strength (Lbs.:'sq.in.):
Spe~'rs:n M c-a~,,i.-~l Age
ECM 114 7" 7 10/31/94 99,380 3,520
ECM 115 7" 7 10/31/94 98,900 3,500
ECM 116 7" 28 11/21/94
ECM 117 7" 28 11/21/94
Test Me~ UtH~ Fmca~ Reg~ar Cylinders Made By: V. S
A~M C-31,C-39,C4~3 ,L'M~ss No~ O~
Remarks and/or Disnribution:
Bill Anderson - Dowdy. Ande~on and Associates, Inc.
~' Davis - City of Coppell
Ail letters and mpcnns an: for 'd~ exclusive u~ of ~h~ ¢iem :o whom '.hey am addressed and shall nm b~ .~prodtgnxl ~ithout hh~ baLI approx.'a! of GEE Co~ul,.ams, Inc. Th~ ~ of out ~m-~e must
o~r prior ~-'ritt~n appel'aL Our letters and repo¢,~ apply only to I~ sam~t.' ~t~ ~,d,/ot' ~.~d ~ at~ ma rgoe~arily ~li~at[vg of Ll~ q~iti~ of apl~mntly identical or similar produc~.