Loading...
Cambridge Phase 1-LR 941101 (2)G EOTECHNICAL E GEE Consultants, Inc. E IN\/IRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (2141 620-9791 · Fax ..'.'214) 620-9T94 REPORT OF CONCRETE MIX INSPECTION Repor~ Date: November 1, 1994 Date Concrete Placed: October 19, 1994 Standard 6"x12" Client: Beamer Development Corporation Area 2g.27 Square Inches Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 30 Comractor: Gr i f f ith Constru ct ion Concrete Supplier and Plant: Lattimore Materials #1 Location of Placement: Drop Inlet Top s,,~.~.' ss~,,~w,. INSPECTION DATA MATERIALS Mix Number: 38 Time Sample Balched: 2:13 pin Cement: 5.0 s.k. Time Sampled: 3:20 pm Sample Location: Castle Creek Drive (west side) Fly Ash: Truck,Ticket No: 305:1015400 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: $5°F 1.ine Aggregate: ' Concrete Range: 82°1. Slump Range (inches): 3" Admixtures: Weather Conditions: Partly Cloudy I R. Air Time Started: 2:45 pm 2 Time. Completed: 4:15 pm Added Water: 10 gal. Sample Air Contem (%): No test Total Cubic Yards Placed: 7.5 CY Required Strength (Lbsdsq.in.): Sp~citr~n Measured Age Dam Total Load Ccnn. pressive Stmng£n R~marks N~r SI~ t~-} ~ys) T~ ,LM.) (L~.'S~.In.{ ECM 111 3" 7 10/26/94 83,740 2,960 ECM 112 3" 28 11/16/94 ECM 113 3" 28 11/16/94 T~t Me~ L'Lii~ Fm~ ~g~ar A~M C-31,C-39.C-143 IU~ Se~ O~ Cylinders Made By: K. Mc. Remarks and/or DistNbution: cc: Bill Anderson- Dowdy, ~d=rson and Associates, Inc. ~' Davis - City' of Coppel{ ~ ~nSUlt~tS, I~C. Reviewed by:~/~~" All ~ttsra and t~ort$ am for ',he ~xcluaiv¢ u~: of th~ clkra to whom they am add.n:ss~l and shall not h~ mgn'cclua~cl wi'A~a ~ .nail a.~al of GEE Consultants, Inc. 'Faa mc oi' ~ nan-~ must r~c~ix~ mir prior writ..en appro,.ad. Out ~t~v$ and m-ports apply only '-o ~ .~ia '.¢at~ at,/or irtspe~.od, and am n~ nac~sari!y indicati'.'~ of ~ quamit[¢a of a .l~tmmiy idcmieai er sin.iLar products.