Cambridge Phase 1-LR 941101 (2)G EOTECHNICAL
E GEE Consultants, Inc.
E IN\/IRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (2141 620-9791 · Fax ..'.'214) 620-9T94
REPORT OF CONCRETE MIX INSPECTION
Repor~ Date: November 1, 1994 Date Concrete Placed: October 19, 1994 Standard 6"x12"
Client: Beamer Development Corporation Area 2g.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 30
Comractor: Gr i f f ith Constru ct ion
Concrete Supplier and Plant: Lattimore Materials #1
Location of Placement: Drop Inlet Top
s,,~.~.' ss~,,~w,. INSPECTION DATA
MATERIALS
Mix Number: 38 Time Sample Balched: 2:13 pin
Cement: 5.0 s.k. Time Sampled: 3:20 pm
Sample Location: Castle Creek Drive (west side)
Fly Ash: Truck,Ticket No: 305:1015400
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: $5°F
1.ine Aggregate: ' Concrete Range: 82°1.
Slump Range (inches): 3"
Admixtures: Weather Conditions: Partly Cloudy
I R. Air Time Started: 2:45 pm
2 Time. Completed: 4:15 pm
Added Water: 10 gal. Sample Air Contem (%): No test
Total Cubic Yards Placed: 7.5 CY
Required Strength (Lbsdsq.in.):
Sp~citr~n Measured Age Dam Total Load Ccnn. pressive Stmng£n R~marks
N~r SI~ t~-} ~ys) T~ ,LM.) (L~.'S~.In.{
ECM 111 3" 7 10/26/94 83,740 2,960
ECM 112 3" 28 11/16/94
ECM 113 3" 28 11/16/94
T~t Me~ L'Lii~ Fm~ ~g~ar
A~M C-31,C-39.C-143 IU~ Se~ O~ Cylinders Made By: K. Mc.
Remarks and/or DistNbution:
cc: Bill Anderson- Dowdy, ~d=rson and Associates, Inc.
~' Davis - City' of Coppel{
~ ~nSUlt~tS, I~C. Reviewed by:~/~~"
All ~ttsra and t~ort$ am for ',he ~xcluaiv¢ u~: of th~ clkra to whom they am add.n:ss~l and shall not h~ mgn'cclua~cl wi'A~a ~ .nail a.~al of GEE Consultants, Inc. 'Faa mc oi' ~ nan-~ must r~c~ix~
mir prior writ..en appro,.ad. Out ~t~v$ and m-ports apply only '-o ~ .~ia '.¢at~ at,/or irtspe~.od, and am n~ nac~sari!y indicati'.'~ of ~ quamit[¢a of a .l~tmmiy idcmieai er sin.iLar products.