Loading...
Cambridge Phase 1-LR 941025G EOTECHNICAL ENGINEERING GEE Consultants, inc. E [ NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214~ 620-9794 ROOFENG INSPECTION REPORT Roofing Report No. 15 Page I of 1 Report Date: October 25. 1994 Inspection Date: October 24. 1994 Standino, Seluu Client: City of Coppell 1. Metal Roof Panels and Clips Project: W.T. Cozby Public Library Sinllle Ply Contractor: Diversified Construction I. 4' x 8' Polyiso HP 2.5 R-18.2 Insulation boards 2.6' Carlisle Reinforced Roof Membrane, 045 EPDM Roofing Contractor: Berbice Corp. and Kings of Texas 3. HP Locking Seam Plates 4. 3~' HP Screw Fasteners Idemification: Standing Seam Metal Roof and Single Ply 5. Carlisle 049 EPDM Roofing Membrane 6. Carlisle Sure Seal Splicing Cement EP-95 Test Procedure: Visual Observations Weather Conditions: Partly cloudy to cloudy until I 1:45 a.m., then rain. High winds at 11:00 a.m. Ambient Temperature Range: 63 to 79'F Number of Roofing Members: Berbiee Corp - 4. King of Texas - 6 Square Feet Laid: I~A.. Panels of standing seam, 40' x 252' of single ply Description of Roofing Operations: I. King of Texas began laying 4' x 8' panels of isoboard insulation on metal deck at 8:00 a.m. starting t¥om the west end o£the root'and working east. An inspection was made of insulation boards for wetness and numerous panels were removed. Isoboard panels were secured to thc underlying deck along thc east and west parapet walls, at mid-roof along the north edge of the standing seam roof and around the sky light curved roof. Isoboard was secured using reinforced roofing membrane, 3~4' screws and locking plates spaced 12" O.C. Laying of EPDM membrane ',,.'as then began. Upon completion of approximately half of the single ply membrane, windy condition and threatening weather began to move in. King of Texas began quickly and temporarily cementing using Sure Seal along all joints and vertical surfaces. Single ply membrane was accidently damaged at one location and brought to the auention of the contractor. A double layer of EPDM was added at most roof penetrations and comers. Rain began falling at approximately 11:45 a.m. The north edge of insulation boards as well as numerous un-laid insulation boards were left exposed to the wind and rain. Due to inclement weather, a check for damage and ',vorkmanship will have to be done on next days roofing operations. 2. Berbice Corporation continued to lay standing seam metal roof panels on the west end of the roof adjacent to and on top of the dormer. Standing seam roofing operations were halted at 11:00 a.m. due to high winds. One section of unlaid standing seam panel was damaged duc to wind. cc: GaO' Sieb - City of Coppell Larry,' Davis - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Robert Williams - Brockette Davis Drake, Inc. Technician: R.G. ~~~ Our letters and reports are for the exclusive us~ of the client to whom they are addressed. The use of our name must receive our prior wrimen approval. Our letters and r~orts apply only to the sample tested andior inspected, and are not necessarily indicative of the quantities of apparently identical or similar products.