Cambridge Phase 1-LR 941025 (3)G EOTECHNICAL
ENGINEERING GEE Consultants, Inc.
E N\/IRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · !214) 620-9791 · Fax (214i 620-9794
MOISTURE DENSITY RELATIONSHIP REPORT
Test Report Date:October 25, 1994 Pr~ect No: B-94-0178
Client: Beamer Development Moisture/Density Report No.: 9
Sample Date: September 29, 1994
Project: Estates of Cambridge Manor, Phase I
Identification: Moisture Density Relationship
Test Procedure: ASTM D698
Test Results:
Method ......................................... A
Optimum Moisture Content ............................. 22.2 percent
Maximum Density .................................. 94.2 pounds per cubic foot
Rammer Type ..................................... Manual
Material Description ................................. Dark Gray Cia.,,' (lime treated)
Material Origin .................................... Cambridge Manor kane,
Station 9-4-00
Moisture Preparation Procedure .......................... Air Dry
Liquid Limit ...................................... 45
Plastic Limit ...................................... 25
Plasticity Index .................................... 20
Technician: K.Mc./P.M.
cc: Mr. Bill Anderson - Dowdy, Anderson and Associates, Inc.
Mr. Larry Davis - City of Coppell ~
Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval Our letters and reporls
apply only to the sample tested and~'or inspected, and are not necessarily' indicative of the quantities of apparently identical or smtilar products.