Cambridge Phase 1-LR 941021I G EOTECHNICAL
E GEE Consultants Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214; 620-979'! · Fax ~214~ 62(3}-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: October 21, 1994 Date Concrete Placed: October 13, 1994 Standard 6"x12"
Client: Beamer Development Corporation Area 28.27 Square Inch¢~
Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 29
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete/On-Site
Location of Placement: Cambridge Manor Lane
MATERIALS so~' s.s~ B~t,-~ w:_..
,~,~.~:i~ ,~.~ c.¥~, INSPECTION DATA
Mix Number: Time Sample Berthed: 8:05 am
Cement: Time Sampled: 8:10 am
Fl}' Ash: Sample Location: East end et' approach off of DeForest
Truck."ricket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 69 °F
Fine Aggregate: Concrete Range: 71 °F
Admixtures: Slump Range ('inches): 2.75
Weather Conditions: Partly Cloudy
I Time Started: 7:15 am
2 Time Completed: 9:15 am
Added Water: Sample Air Content ("{ 'i: No test
Total Cubic Yards Placed: 24.0 CY
Required Strength (Lbs/sa. ~ 3: 3,00¢)
S..,'¢cim~n 5,1ca~uved Age D'a'~ To:a~ lx,~i Ccmp.~_~Mv¢ S;.~n&'~.
Nm'nb~r Siren? .hn.I iDass! T~sted ILb~., !Lbs. Sq.ln..
ECM 107 2.75 7 10/20/94 131,720 4,660
ECM 108 2.75 7 10/20/94 122,240 4,320
ECM 109 2.75 :28 11/10/94
ECM 110 :2.75 :28 11/10/94
Test M¢'.h~ds Utiilz~t Frac~.ur~ Regular
A.%q'M C-3hC-3-).C-I-13 ;t':dens No'~ O'-'-~.-~;_~e! ' Cylinders Made Bb': R. G.
Remarks and;or Distribution:
Bill Anderson - Do~dy. Anderson and Associate.,. Inc.
LarD.' Davis - City of Coppell
~ / .__~/
All ietmm and ~oas am for th* cxclusg~ u~ of tl~ cliem to whom '~y am addre.qaed a.nd skag r.o~ ~ .~p. rod'.x~t without th: full a..c~eval of GEE Cc.~asuita~.t~. [nc. 'I'ne u.se cf our r. am~ must m~i~c
out prior *,rittma apprc~.a[. Our k:tter~ and .~.m~s apply o~iy to tl~ sampi~ m*~t and:of imlx~'.od and aec r, cn n~sa.dly ;.ndicad;,* of t2'~ quami'.ie~ of appa~nt2y id~mica[ er simi'ar products.