Cambridge Phase 1-LR 941020 G E
OTECHNICAL
[ GEE Consultants, Inc.
E
NVIRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-979! · Fax r214~ 620-9794
REPORT OF CONCRETE NHX INSPECTION
Report Date: October 20, 1994 Date Concrete Placed: October 12, 1994 Standard 6'x:2"
Client: Beamer Development Corpor&tion Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete Report No.: 28
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete
Location of Placement: Payment
Sou~.- ssD B~:¢.~w:,. INSPECTION DATA
MATERIALS D,:scE. '.p:i,',r. ,.'L~, CuYd:
Mix Number: Time Sample Batched: 8:15 am
Cement: 5 sk Time Sampled: 8:20 alTt
Sample Location: Widening of corner on S E ofdevleopmem site
Fl3' Ash: Tru~:k-q'icket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 58°F
Fine Aegre~ate: Concrete Range: °F
~ ~ Slump Range (inches): 2.75-3.25
Admixtures: Weather Conditions: Clear
I Time Started: 7:20 am
2 Time Completed: 9:30 am
Added Water: Sample Air Content (~): No test
Total Cubic Yards Placed: 75.0 CY
Required Strength (Lbs..'sq.in.k 3.000
S pe~_n~n Mea.qu.~ Age. Dam Tmal Los;! Co,%?ressb.~
Nm'nber Slump ~in.~ .lYa.xs, Test,xl ,:Lbs_.' I.b~. Sq. Ln.:
EEM 103 3.0 7 10/19/94 110,220 3,890
ECM 104 3.0 7 10/19/94 109,620 3,880
ECM 105 3.0 28 11/09/94
ECM 106 3.0 28 11/09/94
Test Metlx.~ Uti;.ized F."a~m'e Regu;a: Cylinders Made By: P. M.
ASTM C-3 ] ,C-39.C- 10.3 ~L't'Acs~ Neuxl Ot~:r~'is~: ' '
Remarks and:'or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates, Inc.
Lan? Davis - City of Coppell
GKE Consultants, Inc. Reviewed by:
All '..'t~m and ~,~ are fo~ '~h= exclu$g,= us~ of r~ cilent to ~.hom '.hey a,'e adfireasod and shall r~ be .,pp.'xxlueed wit.hou~ ~ f~l approval of GEE Cot~ultants, Inc. Tim ~ of our .,-atme mu.st rt:~eNe
our prior *,-titan approval. Our letter,s and .-eports apply only :o '.~ saw, pie :ea~cd and:er ;a,apect~ -,md a~ r~ nece.~aarily i~icati'-c of