Cambridge Phase 1-LR 941020 (3)G EOTECHNICAL
E GEE Consultants, Inc.
F I NVlRON,N' E×T,-XL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214~ 620-9791 · Fax r214! 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: October 20, 1994 Date Concrete Placed: October 10, 1994 Standard6"xl2"
Client: Beamer Development Corporation Area 2g.lTSquare Inches
Project: Estates of Cambridge Manor, Phase I Con~re:eRepo~No.: 26
Contractor: S itc Concrete
Concre',¢ Suppl:.¢r and Plant: Site Concrete
Location of Placement: Main Road, In-Bound Lane
MATERIALS So .,,,~' ssr~ .~,,~ w,.~.
~.~,i~ :L~ c=v~: INSPECTION DATA
Mix Number: Time Sample Batched: 1:30 pm
Cement: Time Sampled: 1:45 pm
Fl)' Ash: Sample Location: 410' north of DeForest on in-bound lane
Truc k.-'Tic ket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 70" F
Fine Aggregate: Concrete Range: °F
Admixtures: Slump Range (inches): 5:/:"
Weather Conditions: Clear
I Time Started: 7:30 am
2 Time Completed: 4:50 pm
Added Water: Sample Air Content ~e.:~): No te~t
Total Cubic Yards Placed: 90.0 CY
Required Strength (Lbs.;sq.in.): 3.000
Specimen Measured Age Date Total Lo~a Com.?re.,*s[~-e S'.rength
Number S hm,.p in.) 'Days: Te~ted ..Lbs.: , L~.'gq.ln.,
ECM 95 5½ 7 10/17/94 89,640 3,170
ECM 96 5½ 7 10/17/94 70,840 2,510 Spail Edge Break
ECM 97 5% 28 11/07/94
ECM 98 5½ 28 11/07/94
Test 5,1c,.i-.,~d~ t.':ilizod F~um Regu~tr
ASTM C-3LC-39.C-:..:3 Unless ~;o~o O'-~:*:~,: Cylinders Made By: V. S.
Remarks and.:or Distribution:
Bill Anderson - Dowdy, Anderson and Associates. Inc.
Larry Davis - City of Coppell
GEE Consultants, Inc. Reviewed by:
Ail ;et'eva aad repor'.s a~ for the e, xci~iv¢ ~ of tl~ diem to *.'ho~ th:~ am addms~d and shall .'xx be rapine>aced ',,,'itho~ '.~ MIl a?prox'ai 0£ GEE Cov. sultants, Inc. 'Fne use ef om- ~ must our pti. or ~rit~n aptnoval. Our i~tu:vs and ~'eport* apply only to h~'~ .samg, le ,.e. sltxt and 'or [m.~.cve, d and am not .'w..cessadly irdicative of ~ q".m~ities of ap,;-a.n:n:ly ~deaticai or similar