Loading...
Cambridge Phase 1-LR 941020 (3)G EOTECHNICAL E GEE Consultants, Inc. F I NVlRON,N' E×T,-XL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214~ 620-9791 · Fax r214! 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: October 20, 1994 Date Concrete Placed: October 10, 1994 Standard6"xl2" Client: Beamer Development Corporation Area 2g.lTSquare Inches Project: Estates of Cambridge Manor, Phase I Con~re:eRepo~No.: 26 Contractor: S itc Concrete Concre',¢ Suppl:.¢r and Plant: Site Concrete Location of Placement: Main Road, In-Bound Lane MATERIALS So .,,,~' ssr~ .~,,~ w,.~. ~.~,i~ :L~ c=v~: INSPECTION DATA Mix Number: Time Sample Batched: 1:30 pm Cement: Time Sampled: 1:45 pm Fl)' Ash: Sample Location: 410' north of DeForest on in-bound lane Truc k.-'Tic ket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 70" F Fine Aggregate: Concrete Range: °F Admixtures: Slump Range (inches): 5:/:" Weather Conditions: Clear I Time Started: 7:30 am 2 Time Completed: 4:50 pm Added Water: Sample Air Content ~e.:~): No te~t Total Cubic Yards Placed: 90.0 CY Required Strength (Lbs.;sq.in.): 3.000 Specimen Measured Age Date Total Lo~a Com.?re.,*s[~-e S'.rength Number S hm,.p in.) 'Days: Te~ted ..Lbs.: , L~.'gq.ln., ECM 95 5½ 7 10/17/94 89,640 3,170 ECM 96 5½ 7 10/17/94 70,840 2,510 Spail Edge Break ECM 97 5% 28 11/07/94 ECM 98 5½ 28 11/07/94 Test 5,1c,.i-.,~d~ t.':ilizod F~um Regu~tr ASTM C-3LC-39.C-:..:3 Unless ~;o~o O'-~:*:~,: Cylinders Made By: V. S. Remarks and.:or Distribution: Bill Anderson - Dowdy, Anderson and Associates. Inc. Larry Davis - City of Coppell GEE Consultants, Inc. Reviewed by: Ail ;et'eva aad repor'.s a~ for the e, xci~iv¢ ~ of tl~ diem to *.'ho~ th:~ am addms~d and shall .'xx be rapine>aced ',,,'itho~ '.~ MIl a?prox'ai 0£ GEE Cov. sultants, Inc. 'Fne use ef om- ~ must our pti. or ~rit~n aptnoval. Our i~tu:vs and ~'eport* apply only to h~'~ .samg, le ,.e. sltxt and 'or [m.~.cve, d and am not .'w..cessadly irdicative of ~ q".m~ities of ap,;-a.n:n:ly ~deaticai or similar