Cambridge Phase 1-LR 941020 (5)J G EOTECHNICAL
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas. Texas 75229 · !214) 620-9791 · Fax ~214~ 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: October 20, 1994 Date Concrete Placed: September 2]., ].994 Standard 6"xl2"
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete Report No.: 14
Contractor: Gr i f f ith Construct ion
Concrete Supplier and Plant: Lattimore Materials Co./Plant #3
Location of Placement: Inlet (sidewalk) and Base
MAT ER IAL S s .... ssD B,,~-~ w~.
~,~ .-~_~..c-~, INSPECTION DATA
Mix Number: 38 Time Sample Batched: 3:09 pill
Cement: 5 sk Time Sampled: 3:45 pm
Fly Ash: Sample Location: N side inlet ~ Station 3 + 50 sidewalk
Tn~c k.q'ieket No: 456.:3006466
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: °F
Fine Aggregate: Concrete Range: *F
Admixtures: Slump Range (inches): 4~.,'~
Weather Conditions: Partly Cloudy
1 Air Time Stained: 3:l0 pm
2 Time Completed: 4:25 pm
Added Water: 5 gallons Sample Air Content (f~): No test
Total Cubic Yards Placed: 6.0
Required Strength (Lbs.:sq.in.): N/A
ECM 40 4½ 7 09/28/94 120,140 4,250
ECM 41 4½ 28 10/19/94 149,840 5,300
ECM 42 4½ 28 10/19/94 158,060 5,590
ASTM C-31.C-39, C-1~3 ~Uni~s No,.~ o..h~.,-~-~.~ Cylinders Made By: K. Mc.
Remarks and;or Distribution:
cc: Bill Anderson - Dowdy, Anderson and Associates, Inc.
Larry Davis - City of Coppell
GEE Consultants, Inc. Reviewed by:
All letters and re.4xn~ am for ~ exciu~ivo me of th~ ¢!ie~t to whom t~., am add,-~s~ and shall ~ be r~p.'xxluc~d witho~ ~ ~.all approval of GEE Comu!tant$. Inc. Th~ :ne of our narr~ .,nuat ~i~
at= r--tier ~ritl~x approval. Out ktl~s and ~ aggly oni.v to tl~ sarngh: teol~l and:or impeet~d and ar~ ncn rte~e~r;.ly indieati~ of ate qua~tifie~ of ar .~a.n:ntly "-,~-'ntical or similar prelects.