Loading...
Cambridge Phase 1-LR 941020 (5)J G EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas. Texas 75229 · !214) 620-9791 · Fax ~214~ 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: October 20, 1994 Date Concrete Placed: September 2]., ].994 Standard 6"xl2" Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Concrete Report No.: 14 Contractor: Gr i f f ith Construct ion Concrete Supplier and Plant: Lattimore Materials Co./Plant #3 Location of Placement: Inlet (sidewalk) and Base MAT ER IAL S s .... ssD B,,~-~ w~. ~,~ .-~_~..c-~, INSPECTION DATA Mix Number: 38 Time Sample Batched: 3:09 pill Cement: 5 sk Time Sampled: 3:45 pm Fly Ash: Sample Location: N side inlet ~ Station 3 + 50 sidewalk Tn~c k.q'ieket No: 456.:3006466 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: °F Fine Aggregate: Concrete Range: *F Admixtures: Slump Range (inches): 4~.,'~ Weather Conditions: Partly Cloudy 1 Air Time Stained: 3:l0 pm 2 Time Completed: 4:25 pm Added Water: 5 gallons Sample Air Content (f~): No test Total Cubic Yards Placed: 6.0 Required Strength (Lbs.:sq.in.): N/A ECM 40 4½ 7 09/28/94 120,140 4,250 ECM 41 4½ 28 10/19/94 149,840 5,300 ECM 42 4½ 28 10/19/94 158,060 5,590 ASTM C-31.C-39, C-1~3 ~Uni~s No,.~ o..h~.,-~-~.~ Cylinders Made By: K. Mc. Remarks and;or Distribution: cc: Bill Anderson - Dowdy, Anderson and Associates, Inc. Larry Davis - City of Coppell GEE Consultants, Inc. Reviewed by: All letters and re.4xn~ am for ~ exciu~ivo me of th~ ¢!ie~t to whom t~., am add,-~s~ and shall ~ be r~p.'xxluc~d witho~ ~ ~.all approval of GEE Comu!tant$. Inc. Th~ :ne of our narr~ .,nuat ~i~ at= r--tier ~ritl~x approval. Out ktl~s and ~ aggly oni.v to tl~ sarngh: teol~l and:or impeet~d and ar~ ncn rte~e~r;.ly indieati~ of ate qua~tifie~ of ar .~a.n:ntly "-,~-'ntical or similar prelects.