Loading...
Asbury Manor-LR 980206FUGRO-McCLELLAND (SOUTHWEST), INC. ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Ryland Homes Report Date: February 6, 1998 PROJECT: Asbury Manor, Coppell, Texas Project No.: 0771-2111 SAMPLE DATE::-' January 28,..1998. CONTRACTOR: TICKET NO.: 17397 CONCRETE SUPPLIER: Redi Mix AMBIENT TEMP. (°F): 68 PLANT/TRUCK: 628 CONCRETE TEMP. (°F) (ASTM C-1084): 65 MIX ID NUMBER: 730 TIME BATCHED: 12:30 p.m AIR (%) (ASTM C-231): 4.0 TIME SAMPLED: 1:15 p.m WATER ADDED (gal): 5 WEATHER CONDITION: Sunny SLUMP (in.) (ASTM C-143) .' 4 LOCATION OF PLACEMENT: Curb around inlet top CONCRETE' CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6' x t2", 28.27 square :inches . TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) AMC 71 7 2/4/98 127000 4492 3000/28 days AMC 72 28 2/25/98 AMC 73 28 2/25/98 AMC 74 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ ~] ~ E~] Curing: Methods: ASTM Co39 Fracture: A B C D REMARKS: Technician: Jack Roberts FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By: ~ SMH/hb Distribution: Ryland Homes - Fred Phillips Goodwin & Marshall - Matt Goodwin City of Coppell - Garreth Campbell City of Coppell - Larry Davis Legends Construction - Jimmy Henderson