ST0301C-CS130201 F R E E S E Innovative approaches
. o Practical results
Q1 , Outstanding service
1701 N Market St.,#500,LB51 • Dallas,Texas 75202 • 214-217-2200 • fax 214-217-2201 www.freese.com
PROJECT: Bethel Road Reconstruction, Phase III - DATE: February 1, 2013
CPL03243 61-e); -e) % C
TO: Keith Marvin, P.E.
COMPANY: City of Coppell,Texas
ADDRESS: 255 Parkway Blvd.
Coppell,TX 75019
PHONE NO.: 972-304-3681
FROM: B. Caleb Thornhill, P.E.
CC:
WE ARE SENDING YOU THE FOLLOWING ITEMS:
2—Full size sets of plans
2—Half size sets of plans
1—Technical Specifications
Pr Attached r under separate cover via:
✓ Delivery Service and Tracking No.
✓ Hand Delivery r Email r Other
THESE ITEMS ARE TRANSMITTED FOR YOUR:
✓ Use r Review and Comment r Information
✓ Approval r Distribution to Parties r Response
✓ Records r Other:
REMARKS:
Keith,
Attached are two (2) sets of full size (22"x34") plans,two (2) sets of half size (11"x17")and one (1) set of
technical specifications for Bethel Road Reconstruction, Phase III. I've also attached your original
comments. The following comments from your original set have not been addressed:
- SHT LP-1—Area circled behind Travis street
- SHT PV-2—"Water to kill? Check with Ted"
- SHT PV-5—"Where does this go?" Driveway at STA 2+99.80. Currently not existing driveway,
but new driveway shown on 2005 plans.
- SHT PV-8—"Keep this drive on property?" Property currently has 2 driveways at this location.
- SHT PV-9—"Demo?", "Remove asphalt?", "8'Trail to park?"
- SHT SD-1—Railing length, need to discuss
- SHT SD-3—"Anything need to change?" We've converted grate lids in street to manholes. We
have not altered any of the other existing storm drain layouts.
- SHT SD-5—"Grading?" There is an existing ditch that comes to this area.
Caleb Thornhill, P.E.
Freese and Nichols, Inc.