Loading...
WA9401-CS 941216 (3)December 16, 1994 Mr. D. Doug Alumbaugh, Vice President Architectural Utilities, Inc. P.O. Box 300 Fort Worth, TX 76110 RE: East Beltline Road Water Line Project (WA 9. Dear Mr. Alumbaugh: KMG Ci3$ PJC This letter will serve as your official notice to bel purposes of the contract. your calendar days will sl March 16, 1995. If you should begin work prior t. date of your calendar days will be adjusted accordin Your executed copy of the contract is transmitted with this letter. If you should have any questions, please contact me at (214)393-1016. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/Director of Public Works CC: Jim Witt, City Manager Linda Grau, City Secretary Larry Davis, Construction Inspector DATE The C~ty Wit~A=Beautifbl ~F:~tS: P 0 Box 478 Coopei!. Tex,F......, 75019 2! 4 - 462-0022 FAX 2'14 - 393-0948 December 16, 1994 Mr. D. Doug Alumbaugh, Vice President Architectural Utilities, Inc. P.O. Box 300 Fort Worth, TX 76110 RE: East Beltline Road Water Line Project (WA 94-01) Dear Mr. Alumbaugh: This letter will serve as your official notice to begin work on the referenced project. For purposes of the contract, your calendar days will start on December 27, 1994 and expire on March 16, 1995. If you should begin work prior to December 27, 1994, then the expiration date of your calendar days will be adjusted accordingly. Your executed copy of the contract is transmitted with this letter. If you should have any questions, please contact me at (214)393-1016. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/Director of Public Works cc: Jim Witt, City Manager Linda Grau, City Secretary Larry Davis, Construction Inspector