WA9401-CS 941216 (3)December 16, 1994
Mr. D. Doug Alumbaugh, Vice President
Architectural Utilities, Inc.
P.O. Box 300
Fort Worth, TX 76110
RE: East Beltline Road Water Line Project (WA 9.
Dear Mr. Alumbaugh:
KMG
Ci3$
PJC
This letter will serve as your official notice to bel
purposes of the contract. your calendar days will sl
March 16, 1995. If you should begin work prior t.
date of your calendar days will be adjusted accordin
Your executed copy of the contract is transmitted with this letter.
If you should have any questions, please contact me at (214)393-1016.
Sincerely,
Kenneth M. Griffin, P.E.
Asst. City Manager/Director of Public Works
CC:
Jim Witt, City Manager
Linda Grau, City Secretary
Larry Davis, Construction Inspector
DATE
The C~ty Wit~A=Beautifbl ~F:~tS:
P 0 Box 478
Coopei!. Tex,F......, 75019
2! 4 - 462-0022
FAX 2'14 - 393-0948
December 16, 1994
Mr. D. Doug Alumbaugh, Vice President
Architectural Utilities, Inc.
P.O. Box 300
Fort Worth, TX 76110
RE: East Beltline Road Water Line Project (WA 94-01)
Dear Mr. Alumbaugh:
This letter will serve as your official notice to begin work on the referenced project. For
purposes of the contract, your calendar days will start on December 27, 1994 and expire on
March 16, 1995. If you should begin work prior to December 27, 1994, then the expiration
date of your calendar days will be adjusted accordingly.
Your executed copy of the contract is transmitted with this letter.
If you should have any questions, please contact me at (214)393-1016.
Sincerely,
Kenneth M. Griffin, P.E.
Asst. City Manager/Director of Public Works
cc: Jim Witt, City Manager
Linda Grau, City Secretary
Larry Davis, Construction Inspector