CF-Pump Station-CS 870212GINN, INC. CONS! LTING ENGINEERS February 12, 1987 Mr. Craig Pippett Hydrostorage, Inc. P.O. Box 1685 Des Moines, IA 50306 Re: 1.5 MG Elevated Tank -- Coppell, Texas Dear Mr. Pippett: Reference February 2, 1987, letter from Mr. Abram DeVaul, P.E., Pitt-Des Moines, Inc., regarding inlet/outlet pipe, we offer the following comments. Since what is being proposed is a changed condition from that which is shown on the plans, we need to receive additional information prior to construction review and approval. The sketch provided by Mr. DeVaul is not an accurate depiction of actual field conditions, as it now exists. We requested engineering calculations be provided identifying the forces to be restrained along with your recommendations as to how those forces will be restrained. Any combination of retainer glands, concrete thrust blocks and/or tie rods should be shown along with calculations. The information provided us on the "Megalug" joint restraint does not address anything more than deflection of joints. No information was provided on bends. In order to properly evaluate what you are proposing, we need additional information, including calculations indicating adequate thrust restraint is being provided. In summary, it appears that the restrained system, that is in place at this time, could possibly work. We have no objections to the use of the concrete thrust block at the 90 degree bend, the "Megalug" retainer glands, or the 8-3/4" diameter all-thread rods, separately or all in combination; but, we need to have back-up material to justify the proposed changes. As soon as this information is provided, we will continue construction review on this portion of the project. Sincerely, Gabe Favre cc: Frank Trando Wayne Ginn Shohre Daneshmand Randy Fleming Steve Goram Butch Ellison Abram Devaul Rueben Martinez 17103 Preston Re,ad · Suite 100 · [.B II8 · Dallas. Texas 75248 · Phone 214'248-4900