Tax 2011B-CS120618fiWAl'ICE
GEOTECMIUC
GROUF
June 18, 2012
Mr. George S. Marshall, P.E.
Civil Engineer
City of Coppell
255 Parkway Boulevard
Coppell, Texas 75019
Re: Vanberbber Drive Street Improvements
Coppell, Texas
Engineering Inspection & Testing Services
AGG Proposal No: P12 -0613C
Dear Mr. Marshall:
• GEOTECHNICAL ENGINEERING
• ENVIRONMENTAL CONSULTING
• CONSTRUCTION MATERIALS ENGINEERING AND TESTING
Phn: (972) 304 -3562
Email: gmarshall @coppelltx.gov
Alliance Geotechnical Group (AGG) is pleased to confirm our firm's interest in providing
materials inspection and testing services for the proposed Vanberbber Drive project noted
above. A schedule of unit fees for this project is attached.
After reviewing our fee schedule if you have any questions, please contact the undersigned at
(972) 444 -8889. If acceptable, please sign below and fax back to our office as our Authorization
to Proceed. We look forward to the opportunity of working with you on this project.
Respectfully submitted,
ALLIANCE GEOTECHNICAL GROUP
Perry Kakara, S.E.T.
CME Department Manager
Approved by:
Signature
MEMBER
3228 Halifax
Tel: 972. 444.8889 • I
Robert P. Nance
President
Date: /
AWMSMC PSI
SCHEDULE OF FEES
FOR
CONSTRUCTION MATERIALS ENGINEERING & TESTING
VANBERBBER DRIVE STREET IMPROVEMENTS COPPELL, TEXAS AGG PROPOSAL NO.: P12 -0613C
DESCRIPTION OF SERVICES QUANTITY UNIT FEE UNIT FEE
A. SUBGRADE TESTING & INSPECTION
• Moisture /Density Relationship of Soils (ASTM D -698)
• Atterberg Limits
• Lime Series ( 5 point PI method)
• Cement Series ( as needed )
• Sulfate Test
• Driveway Subgrade Density Test ( 1 per driveway)
• Sidewalk Density Tests ( 1 per 300 If)
• Barrier Ramp Density Tests ( 1 per ramp)
• Lime Gradation Test (1 per 300 If)
• Lime Depth Verification (1 per 300 If)
• Lime Subgrade In -Place Density Test (1 per 300 If)
• Retaining Wall Backfill Density Test (1 per lift)
• Sr. Engineering Tech to perform testing
• Project Manager
• Geotechnical Project Manager( as needed )
• Sr. Geotechnical Engineer ( as needed )
• Vehicle Charge
B. UTILITY BACKFILL TESTING & INSPECTION
• Moisture /Density Relationship of Soils (ASTM D -698)
• Atterberg Limits
• Sieve Analysis for Embedment
• In -Place Density Test* (ASTM D2922)
• Concrete Test Cylinders (4 cyls per set) inlets,manholes
• Sr. Engineering Tech to perform testing
• Project Manager
• Vehicle Charge
P12-0613C
3
@
$150.00
each
$450.00
3
@
$50.00
each
$150.00
3
@
$225.00
each
$675.00
0
@
$375.00
each
$0.00
3
@
$90.00
each
$270.00
11
@
$13.00
each
$143.00
6
@
$13.00
each
$78.00
10
@
$13.00
each
$130.00
10
@
$13.00
each
$130.00
10
@
$13.00
each
$130.00
10
@
$13.00
each
$130.00
0
@
$13.00
each
$0.00
57
@
$37.00
hour
$2,109.00
5
@
$75.00
hour
$375.00
0
@
$90.00
hour
$0.00
0
@
$110.00
hour
$0.00
19
@
$35.00
trip
$665.00
Sub -Total
$5,435.00
3
@
$150.00
each
$450.00
3
@
$50.00
each
$150.00
2
@
$35.00
each
$70.00
69
@
$13.00
each
$897.00
16
@
$14.00
each
$224.00
48
@
$37.00
hour
$1,776.00
4
@
$75.00
hour
$300.00
12
@
$35.00
trip
$420.00
Sub -Total
$4,287.00
SCHEDULE OF FEES
FOR
CONSTRUCTION MATERIALS ENGINEERING & TESTING
VANBERBBER DRIVE STREET IMPROVEMENTS COPPELL, TEXAS AGG PROPOSAL NO.: P12 -0613C
DESCRIPTION OF SERVICES QUANTITY UNIT FEE UNIT FEE
C. CONCRETE & REINFORCING TESTING & INSPECTION
• Concrete Inspection & Testing (regular time)
67
@
$37.00
hour
$2,479.00
• Concrete Cylinder Test -(4 cyls per 100 cyd ) - Paving
60
@
$14.00
each
$840.00
• Concrete Cylinder Test -(4 cyls per 100 cyd ) - Sidewalk
8
@
$14.00
each
$112.00
• Concrete Cylinder Test -(4 cyls per 100 cyd ) - Driveways
12
@
$14.00
each
$168.00
• Concrete Cylinder Test -(4 cyls per 100 cyd ) - Barrie ramps
12
@
$14.00
each
$168.00
• Concrete Core Depth Checks ( 2" dia core / 300 If)
5
@
$40.00
each
$200.00
• Project Manager
7
@
$75.00
hour
$525.00
• Vehicle Charge
17
@
$35.00
trip
$595.00
Sub -Total
$5,087.00
NOTES:
ESTIMATED TOTAL $14,809.00
1. Overtime rates of 1.5 times the regular hourly rate will be charged for hours worked over eight (8) hours
per day Monday thru Friday or any time before 7:00 a.m, or after 5:00 p.m. Service performed on Saturdays
and Sundays will be billed at 1.5 times the regular hourly rate. Services performed on recognized holidays
will be billed at 2.0 times the regular hourly rate. ( WILL BE BILLED TO CONTRACTOR)
2. All laboratory test fees are F.O.B. our laboratory; additional charge for sample pickup may apply.
3. Any additional tests will be billed on a hourly rate and charged at the applicable rate, portal -to- portal.
4. Additional test not specified in this proposal will be quoted upon request.
5. This proposal does not include any technician stand -by, non - readiness charges, and /or trips or re -tests of the
previous failing tests.
6. The above unit rates are based on the following estimated schedule:
" Concrete paving - 6 placements estimated
Concrete sidewalk - 2 placements estimated
Barrier free ramps - 3 placements estimated
Concrete driveways - 3 placements estimated
Sidewalks - 2 placements estimated
Concrete inlets - 4 placements estimated
Lime subgrade- 4 estimated site visits
Sidewalk subgrade - 3 estimated site visits
* Driveway subgrade - 4 estimated site visits
Barrier free ramp subgrade - 4 estimated site visits
Site utilities - 10 estimated site visits
P12 -0613C