Denton Co Levee-CS120412MEMORANDUM TO: Board of Directors Denton County Levee Improvement District Rio. 1 FROM: Russell Erskine, PE 409e Mathew L. Busby, EIT EMAIL: rerskine @halff.com rnbusby@halff.com SUBJECT: Denton Creek Outfall Erosion Protection t-tatff Associates, Inc. 12011 North Bowser Road Richardson. Texas 75081 (214) 346 -6200 Fax (214) 739 -0095 DATE. April 12, 2012 AVO: 28540 Attached is a cost: estimate for implementing erosion protection at several outfalls along Denton Creek, between MacArthur Boulevard and Denton Tap Road_ Recommendations are based on field observations conducted on January 17, 2012 and April 10, 2012. Headwalls located below the normal water surface do not exhibit significant signs of erasion. headwalls located above the normal water surface could be removed and replaced at a lower elevation to reduce erosion. in lieu of this extensive replacement, Halff prepared an estimate for controlling erosion using riprap and Scour Stop, a vegetated riprap alternative. Scour Stop is used in relatively flat areas with established vegetation that, with reinforcement, will sustain erosive forces, Riprap is used in areas where velocities are higher and periods of inundation are longer. Size is based on flow velocities. Riprap size is described using the median diameter (Dw) of stone to be installed. The riprap layer thickness is based an a depth twice the median diameter, The stone used for riprap will need to he well - graded for long -term integrity of the riprap blanket. Geotextile is used for soil separation beneath the riprap. Proper installation of the riprap is important to longevity. Before installing erosion protection, existing erosion damage will need to be repaired. In areas where a structure has been undermined and compaction would be difficult, self - compacting Plowable fill is recommended to backfill the existing eroded area. Other areas should be backfilled with a cohesive soil and adequately compacted. Ouffall. 6 showed more significant structural darnage than the other outfalls. See attached maps for location. A site visit revealed separation in the pipe joint connecting to the outfall (approximately 2" gap) as well as a sinkhole near the top of the outfall. This outfall should be reconstructed. it is recommended that the outfall be located at or below the normal water surface to reduce erosion. Construction below the water level involves special considerations, such as coffer dams, during construction. PROJECT* DCLID OUTFALL EROSION PROTECTION HALFF ASSOCIATES, INC. PREPARED BY. MLB AVO: 28544 CHECKED BY. RE • PLAN ITEMS NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE BID ESTIMATE 1 18 "ROCK RIP RAP CY 1 18 87.00 S 7,566.00 2 GEOTEXTILE {8 oz minimum) 5Y 37 1A0 5 37.00 TOTAL: 11 OUTFALL PLAN ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE 810 EM MATE 1 18" ROCK RSPRAP CY 53 $ 87.00 S 4.611.00 2 24" ROCK RIPRAP CY 95 $ 75.00 $ 7.125.00 3 FLOWABLE FILL CY 5 $ 78.00 $ 390.00 4 GEOTEXTILE f8 ox. minimum SY 195 $ 1.00 $ 195.00 TOTAL 11 a PLAN ITEM NO. ITEM DESCRIPTION UNIT (QTY. UNIT PRICE SID ESTIMATE 1 78" ROCK RIPRAP CY 67 $ 87.001$ 5,829.00 2 FLOWABLE FILL CY 5 $ 78.00 $ 390.00 3 GEOTESCTILE fA oz, n-liftuaLl SY I i $ i.00 t $ 98.00 TOTAL F1 a PLAN ITEM: NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE BID ESTIMATE 1 FILL (95% COMPACTION) CY s $ 14.00 $ 70.00 2 SCOURSTOP MAX EA 30 $ 64.00 $ 1,920.00 3 SCOURSTOP ANCHORS EA 150 $ 2.00 $ 300.00 4 GEOTEXTH-E 8 oz. minimum SY 55 $ 1.00 $ 55.00 TOTAL FI OUTFALL PLAN ITEM NO. ITEM Dl;Sl RIPTION UNIT QTY. UNIT PRICE B 1 FILL (95 %a COMPACTION) CY 5 $ 14.00 2 SCOURSTOP MAT EA 30 $ 64.00 3 SCOURSTOP ANCHORS EA 150 S 2.00 4 GEOTEXTILE 8 oz. minimum SY 55 $ 1.00 TOTAL 11 • UTFALL 6 (RE MOVE AN t REPLAC E) PLAT! ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE BID ESTIEATE 1 REMOVE EMS TING ttOU ALL EA 7 is 400.00 $ 400.00 2 42" CLASS III RCP LF 90 $ 90.00 $ 8.700.00 3 SLOPED END SECTION 4:1 EA 1 2,750.00 S 2,750.00 TOTAL 1,25o .Do PLAN ITEM NO. ITEM DESCRIPTION UNIT QTY, UNIT PRICE BID ESTIMATE 1 FILL {950/. COMPACTION) CY 10 14.00 4151,01) 2 24" ROCK RIPRAP CY 36 $ 75.00 S 2,7 3 GEOTEXTILE $ 4Z minimum SY 55 $ 1.00 S s 2,895.00 SUBTOTAL $ 39,076.00 i 1', li OVERALLTOTAL $ 47,000.00 Ttiis statement was prepared utilizing standard cost and/or estimating practises. It is understood and agreed that this is a statement of probable construction cost only, and the Engineer small not be liable to the Owner or anyThird Party for any failure to accurately estimate the cost and/or quantities for the project, or any part thereof. Notes. 1. Excludes professional engineering fees. 2. Excludes surrey fees for easements by separate instrument or R.O.W. dedication 3. Excludes relocation of any franchise utilities (to be determined) •" THIS SHEET None fvlade by HALFF' won JOIL&Q1 *_1 rc y LL-9 lmma IS Date Dept. Show No. 7q 1470 OW&I I �q ---------- iqll €3 s ' n r w '' .A a. '' 4 If ..�: �a,.hrf �l A ., '"LkF ij S ,.;:,.:),.',,'...‘...4'.„!..A% .1„..; V.:. t .-R lilt .1-:'s ia+nx " is uxs { - Alp ce: i sn ,' _: t Y prv; k , , s ' "..;1 , lf...•;`,, ;Aie', __.,.1.k, ; 4,,, ,-4 u r 3 4 • vb 1 f gy Y � d rya. � rt �' � � # ;• y "' �"' f AYp , .Y`u;# o ,bf .<i( py e *.,,,,,,i.,,4104,- .vic. 711„..4‘,1.04414 flIv. 3 v .,.., 4t, , { „, , tit 3. - ,!,,,!:,- ' S7a r Wm - OF _w eP @ Niv inig mi r _ iA J' x OAS k� � 5 nw. AM Wray - slow 061 so W1, s iii,... 5 y�i! •Y y }�. / ,� ,ix: �'� ���.am�ru- • G5 'rte � • 4- e- i•` r «e r a tr:�.r'3' x - k' `'-4. .w 3. ' Q �t f 4 � l�: k� "^ � °�� � R`P � i Ted' �•, • 1. h f_ri+� pJq rN lk�? from l,y5cy,k 4� p () 1jr�•[}� h 3 .ems i.'^ Man €GI _ a� €✓ 4 1 iYt i S Y k y t '�3C5' }.�E F'+ '��au- rt✓-i �t L ''`.S'r�L `A'i' - H k �' r 3 w 0 i `