Loading...
WA9601-CS 961113SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS Phone: (214)361-7900 LUt:v c7 ~DC.9 ~ Fax: (214) 361-0204 Subject: Wagon Wheel Ranch Tank 96149 Memorandum To: Ken Griffin From: Gary Hendricks Date: 11/13/96 Enclosed is the preliminary site plan for the elevated tank project. Please review our layout of the future park entrance road. As we have it shown, additional right-of-way is required for the property to the north. We can shift the entrance to the south, but we like the current layout better. Also, even with a more southern alignment, additional right-of-way is required. Unless major alignment changes are made in the future entrance road, its final location does not have a significant impact on the tank location or site plan. Therefore, we are moving forward with our preparation of final plans while the City evaluates this situation. Once you have had a chance to review this, please give me a call.