CF-Village-CS 890531 GINN, INC. CONSULTING ENGINEERS May 31, 1989 Cajun Contractors, Inc. P.O. Box 540487 Dallas, Texas 75354-0487 ~[~ - ~ ~ ~: City of Coppell, Texas Dear Mr. Hirschey: Per your April 12, 1989 letter and our May 9, 1989 meeting, we have re- evaluated your request for additional compensation on the drilled foundation piers. Based on our review of the Contract Documents, plans, and inspectors log, we are able to substantiate a total of 296.5 VLF of 18" drilled piers above plan quantities for the 32 foundation piers. Therefore, our recommendation to the Owner is for a Change Order in the following amount: 296.5 VLF ~ $24.25/VLF $7,190.13 Bonds & Insurance (~2%) 143.80 Subtotal $7,333.93 Cajun (15%) 1,100.07 Total Change Order $8,434.00 If you concur with the above, please sign all six (6) copies of the Change Order and return them to our office. We will then forward them to the City of Coppell for their consideration. Please note that the Contract Documents require that claims of this nature be submitted in writing within thirty (30) days of the occurrence. Future claims that fail to me~I the required submittal deadline m~y-bc denied on tbi~s. Sincerely, Sanfdrd W. Case, P.E. Project Manager attachments cc:Russell Doyle Steve Goram H. Wayne Ginn, P.E. Smoky Ginn J.R. Richardson File 380 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900