CF-Village-CS 890329 GINN, INC. CONSULTING ENGINEERS
Mr. Karl D. Hirschey ~ ~ 0~
Cajun Contractors, Inc.
P.O. Box 540487 _
Dallas, Texas 75354-0487
Re: Village Parkway Pump Station
City of Coppell, Texas
Pump Foundation Pads
Dear Mr. Hirschey:
After review of the certified pump drawing (Worthington Drawing
#RX186194), it will be necessary to adjust the location of the
pump foundation pads. Each pad is currently shown as 3'-0"
west and 7'-0" east of the piping centerline. The foundation
pads should be shifted to the east approximately 1'-0". The
correct alignment will be 2"-0" west and 8'-0" east of the piping
centerline for each pad.
We have attached a sketch of this adjustment to be made on sheet
S-2 of the plans. Please see that the necessary provisions are
made to properly locate the pump pads.
Please call if you have any questions.
Sincerely,
sanford w. Case, P.E.
Project Managor
attachment
CC:
Steve Goram
Ned Durbin, Cajun Contractors, Inc.
Stan Reed, P.E., Reedcon, Inc.
H. Wayne Ginn, P.E.
Gabe Favre
J.R. Richardson
Smoky Ginn
File 380