Loading...
CF-Village-CS 890329 GINN, INC. CONSULTING ENGINEERS Mr. Karl D. Hirschey ~ ~ 0~ Cajun Contractors, Inc. P.O. Box 540487 _ Dallas, Texas 75354-0487 Re: Village Parkway Pump Station City of Coppell, Texas Pump Foundation Pads Dear Mr. Hirschey: After review of the certified pump drawing (Worthington Drawing #RX186194), it will be necessary to adjust the location of the pump foundation pads. Each pad is currently shown as 3'-0" west and 7'-0" east of the piping centerline. The foundation pads should be shifted to the east approximately 1'-0". The correct alignment will be 2"-0" west and 8'-0" east of the piping centerline for each pad. We have attached a sketch of this adjustment to be made on sheet S-2 of the plans. Please see that the necessary provisions are made to properly locate the pump pads. Please call if you have any questions. Sincerely, sanford w. Case, P.E. Project Managor attachment CC: Steve Goram Ned Durbin, Cajun Contractors, Inc. Stan Reed, P.E., Reedcon, Inc. H. Wayne Ginn, P.E. Gabe Favre J.R. Richardson Smoky Ginn File 380 17103 Preston Road · Suite 100 · I,B 118 · Dallas, Texas 75248 · Phone 214/248-4900