Loading...
CF-Sandy Station-AG 860311~,/,~ The City With A Beautitul Future CI~J OF COPP~T.% City Co~cil Agenda Request GINN, INC. CCNSULTING ENGINEERS February 24, 1986 MEMO TO: City of Coppell Attention: Ed Powell, P.E. City Engineer SUBJECT: Pump Station Improvements Bids were received for the above referenced project on February 20, 1986 at 10:30 AM. Below is a summary of the four (4) bids submitted: Onyx Construction Company $ 45,960.00 Tim Smith Construction Co. 51,131.02 Jamco Construction Co. 65,526.00 C. L. Teel Construction Co. 135,216.42 After reviewing the bids, we acknowledge Onyx Construction Company as the successful low bidder. Bid tabulations are enclosed. It is our recommendation that a contract be awarded Onyx Construction Company for the bid amount of $45,960.00. Contract time for this project is'45 calendar days with liquidated damages in the amount of '$80.00 per calendar day. The source of funding for this project is the current water bond program which budgeted $75,000 for this project. We request that you place this item on the next scheduled council agenda. Please call if you should need any additional information regarding this project. /jc Enclosures 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611 Onyx Construction Company F'LII~F' SI'Al'ION If~F'ROVE~ENI'S )l'Efq NO. Il'ErA ~}l'Y UNIT UNIT PRICE I'OI'AL AmOUN'r 2.10,2-1 El~_c'tpicml C.I.F'. 1 LS $15,500.00 $15,500.00 2.10,2,2 Hi,ih service pump w/motor 1 EA $20,210.00 $20,210.00 2.12.8-1 12" OI 41 LF $100.00 $4,100.00 2.12.8-2 12" DI long r~d. hawse beard 1 EA $750.00 $750.00 2.12.8-~ 12" x 10" rmd~c~r I EA $500.00 $500.00 2.12.8-4 10" brand DI I EA $~00.00 $~00.00 2.1~.1-1 10" ~mtm vmlwa I EA $900.00 $900.00 2.1~.1-2 10" check v~lve i EA $2,500.00 $2,500.00 2.1~.1-~ F're~ssur,B gm~e I EA $200.00 $200.00 2,13.2-1 ~" ~i~- relm~s~m v~lvm 1 EA $1,000.00 $1,000.00 S U B T 0 T A L $45,960.00 Tim Smith Construction PUfqF:' E~TATION IMPROVEMENTS )'I'EI5 NO, Il'EM ~.ll'Y UNIT UNII' PRICE l'Ol'Al_ A~IOUN T 2.10.2--1 Electricml C.I.P. I LS $22,469.00 $22,469.00 2.10.2.2 Hi~lh ser'-vic:e pump w/motor i EA $19,184.00 $19,1~4.00 2.12.8-1 12" DI 41 LF $119.22 $4,888.02 2.12.8-2 12" DI lomb; r~d. bese be~qd I EA $646.00 $64~.00 2.12.8--~5 12" x 10" reduc~ar I EA $515.00 $515.00 2.12.8-4 10" bend DI I EA $511.00 $511.00 2.1~5.1--1 10" gmte vmlwa 1 EA $72~.00 $72~.00 2.1Z5.1-2 10" check v~lw:~ I EA $1,51~.00 $1,5~6.00 2.1~.1--~ Pressure gmu~e I EA $218.00 $218.00 2,1~.2--1 i~" ~r ~'elmms~e w~lve I EA $441.00 $441.00 S U B T 0 T A L $51,1~51.02 Jamco Construction PUMF' STATION IMPROVE~EN]'S II'EI~ NO. ITEM [.ll'Y UNII' UNII' F'RICE I'OI'AL APIOUNT 2.10.2--1 Ele¢:tricml C.I.F'. I LS $20,657.00 $20,657.00 2.10.2.2 HifJh service p~mp w/motor 1 EA $26,~9.00 $26,~9.00 2.12.8-1 12" DI 41 LF $168.00 $6,888.00 2.12.8-2 12" DI longJ r~d. b~se bend 1 EA $8'7~.00 $8'7~.00 2.12.8--i'~ 12" x 10" reducer I EA $61~.00 $61J~.00 2.12.8-4 10" bend DI I EA $~0.00 $~,~0.00 2.1J~.1-1 10" gate valve I EA $966.00 $966.00 2.1~.1-2 10" check v~lve 1 EA $6,~12.00 $6,~12.00 2.1~.1-T~ F'ressurm gauge I EA $~24.00 $~24.00 2.11~.2-1 ~" mir release valve 1 EA $1,564.00 $1,564.00 S U 8 T 0 T A L_ $65,526.00 C. L. Teel Construction '*~MF' STATION IBF'ROVEMEN]'S l l'F']~ NO. ITEM Lll'Y UNII' UNIT PRICE I'Ol'~L A~OUN T 2.10.2-1 Electrici~l C.I.P. I LS $20,800.00 $20,800.00 2.10.2.2 Hi.~Jh service pump w/motor 1 EA $19,884.54 $19,884.54 2.12.8-1 1""~. OI 41 LF $2~102.00 $86,182.00 2,12.8--2 12" DI lon.~ r~d. base bend 1 EA $1,197.22 $1,197.22 2.12.8-~ 12" x 10" reduc~ar I EA $94~.00 $94~.00 2,12.8--4 10" bend DI i EA $552.20 $552.20 2,1~5.1--1 10" gate vmlve 1 EA $2,011.10 $2,011.10 2,1~5.1-2 10" c:he. ck v~lve i EA $~,052.26 $~.~,052.26 2.1~.1-~ Pressure gauge 1 EA $145.60 $145.60 2.11~.2-1 i~" ~ir release w~lve I EA $448.50 $448.50 $ U 8. T 0 T A L $1~5,216.42