City Co~cil Agenda Request
GINN, INC. CCNSULTING ENGINEERS
February 24, 1986
MEMO TO: City of Coppell
Attention: Ed Powell, P.E.
City Engineer
SUBJECT: Pump Station Improvements
Bids were received for the above referenced project on
February 20, 1986 at 10:30 AM. Below is a summary of the
four (4) bids submitted:
Onyx Construction Company $ 45,960.00
Tim Smith Construction Co. 51,131.02
Jamco Construction Co. 65,526.00
C. L. Teel Construction Co. 135,216.42
After reviewing the bids, we acknowledge Onyx Construction
Company as the successful low bidder. Bid tabulations are
enclosed.
It is our recommendation that a contract be awarded Onyx
Construction Company for the bid amount of $45,960.00.
Contract time for this project is'45 calendar days with
liquidated damages in the amount of '$80.00 per calendar day.
The source of funding for this project is the current water
bond program which budgeted $75,000 for this project.
We request that you place this item on the next scheduled
council agenda.
Please call if you should need any additional information
regarding this project.
/jc
Enclosures
16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611
Onyx Construction Company
F'LII~F' SI'Al'ION If~F'ROVE~ENI'S
)l'Efq NO. Il'ErA ~}l'Y UNIT UNIT PRICE I'OI'AL
AmOUN'r
2.10,2-1 El~_c'tpicml C.I.F'. 1 LS $15,500.00 $15,500.00
2.10,2,2 Hi,ih service pump w/motor 1 EA $20,210.00 $20,210.00
2.12.8-1 12" OI 41 LF $100.00 $4,100.00
2.12.8-2 12" DI long r~d. hawse beard 1 EA $750.00 $750.00
2.12.8-~ 12" x 10" rmd~c~r I EA $500.00 $500.00
2.12.8-4 10" brand DI I EA $~00.00 $~00.00
2.1~.1-1 10" ~mtm vmlwa I EA $900.00 $900.00
2.1~.1-2 10" check v~lve i EA $2,500.00 $2,500.00
2.1~.1-~ F're~ssur,B gm~e I EA $200.00 $200.00
2,13.2-1 ~" ~i~- relm~s~m v~lvm 1 EA $1,000.00 $1,000.00
S U B T 0 T A L $45,960.00
Tim Smith Construction
PUfqF:' E~TATION IMPROVEMENTS
)'I'EI5 NO, Il'EM ~.ll'Y UNIT UNII' PRICE l'Ol'Al_
A~IOUN T
2.10.2--1 Electricml C.I.P. I LS $22,469.00 $22,469.00
2.10.2.2 Hi~lh ser'-vic:e pump w/motor i EA $19,184.00 $19,1~4.00
2.12.8-1 12" DI 41 LF $119.22 $4,888.02
2.12.8-2 12" DI lomb; r~d. bese be~qd I EA $646.00 $64~.00
2.12.8--~5 12" x 10" reduc~ar I EA $515.00 $515.00
2.12.8-4 10" bend DI I EA $511.00 $511.00
2.1~5.1--1 10" gmte vmlwa 1 EA $72~.00 $72~.00
2.1Z5.1-2 10" check v~lw:~ I EA $1,51~.00 $1,5~6.00
2.1~.1--~ Pressure gmu~e I EA $218.00 $218.00
2,1~.2--1 i~" ~r ~'elmms~e w~lve I EA $441.00 $441.00
S U B T 0 T A L $51,1~51.02
Jamco Construction
PUMF' STATION IMPROVE~EN]'S
II'EI~ NO. ITEM [.ll'Y UNII' UNII' F'RICE I'OI'AL
APIOUNT
2.10.2--1 Ele¢:tricml C.I.F'. I LS $20,657.00 $20,657.00
2.10.2.2 HifJh service p~mp w/motor 1 EA $26,~9.00 $26,~9.00
2.12.8-1 12" DI 41 LF $168.00 $6,888.00
2.12.8-2 12" DI longJ r~d. b~se bend 1 EA $8'7~.00 $8'7~.00
2.12.8--i'~ 12" x 10" reducer I EA $61~.00 $61J~.00
2.12.8-4 10" bend DI I EA $~0.00 $~,~0.00
2.1J~.1-1 10" gate valve I EA $966.00 $966.00
2.1~.1-2 10" check v~lve 1 EA $6,~12.00 $6,~12.00
2.1~.1-T~ F'ressurm gauge I EA $~24.00 $~24.00
2.11~.2-1 ~" mir release valve 1 EA $1,564.00 $1,564.00
S U 8 T 0 T A L_ $65,526.00
C. L. Teel Construction
'*~MF' STATION IBF'ROVEMEN]'S
l l'F']~ NO. ITEM Lll'Y UNII' UNIT PRICE I'Ol'~L
A~OUN T
2.10.2-1 Electrici~l C.I.P. I LS $20,800.00 $20,800.00
2.10.2.2 Hi.~Jh service pump w/motor 1 EA $19,884.54 $19,884.54
2.12.8-1 1""~. OI 41 LF $2~102.00 $86,182.00
2,12.8--2 12" DI lon.~ r~d. base bend 1 EA $1,197.22 $1,197.22
2.12.8-~ 12" x 10" reduc~ar I EA $94~.00 $94~.00
2,12.8--4 10" bend DI i EA $552.20 $552.20
2,1~5.1--1 10" gate vmlve 1 EA $2,011.10 $2,011.10
2,1~5.1-2 10" c:he. ck v~lve i EA $~,052.26 $~.~,052.26
2.1~.1-~ Pressure gauge 1 EA $145.60 $145.60
2.11~.2-1 i~" ~ir release w~lve I EA $448.50 $448.50
$ U 8. T 0 T A L $1~5,216.42