Loading...
CF-Village-CS 890306~i='~,~ii~,c=-: ...... ·. : .~.~.~.j I ~"' CONTRACTOP~,.~c nATO~ ROLIG£ ,^u. As. Ari.n,,rA March 6, lgsg I~l~!lllli~__~.,L.~,~. ~l~'S~-. -'~ '..-:...l~,ff~/.-.~, ::-:~,.~... ~: ....,. ......... . _ Home Ofli¢®: Dallns Office: Alia^la Office: P.O. Box 104 · BoIon Rouo~, LA 70821-0104 P.O. Box 540487 · D~llnn, TX 75354-0487 4000 Oumt~'lnnd Pkwy., Bldg. 800, $1e. A · All~nla, GA 30339 {504) 2gG-~857 · Fnx Ho. (504,) 291-0777 (214) 5,~)-8811 · Fax No. (214) 550-1818 (404) 33,.~0195 · Fax No. (404) ~lgg Ginn, Incorporated 17103 Preston Road Suite 100 Dallas, Texas 75248 Attention: Mr. Sanford Case, P.E. RE: Village Pkwy Pump Station Open cut installation of Pipe flentlemen: This is an addendum to the cost detail dated February 15, 1989. Material and installation requirements to work around existing utilities near the Sandy Lake Road Pump Station and near the intersection of Sandy Lake Road at Kimbel Kourt are as follows: Location Descriotion Value Sandy Lake Road P.S. Add Iea. 14 degree bend @ $1,600.00 each $ 1,600.00 Sandy Lake Road/K.K, Add 1 ea. 87 degree bend @ $2,800.00 each 2,800.00 Both Add 52 1.f. 36" pipe @ 235./1.f. 12,220.00 Sandy Lake Road/K.K. Delete 50 1.f. tunneling @ 300./1.f. (15,000.00) Sandy Lake Road/K.K. Delete 2 ea. 45 degree bends (3,200,00) $(1,580.00) It shall be understood that these necessary measures are to be included as part of the change order requested. Please do not hesitate to call should you have any questions. Sincerely, CAJy~,CONTRACTORS, INC. Ned Durbin Project Superintendent cc: File 1.11 (8821) Ned Durbin