CF-Village-CS 890306~i='~,~ii~,c=-: ...... ·.
: .~.~.~.j I ~"'
CONTRACTOP~,.~c
nATO~ ROLIG£
,^u. As. Ari.n,,rA March 6, lgsg
I~l~!lllli~__~.,L.~,~. ~l~'S~-. -'~ '..-:...l~,ff~/.-.~, ::-:~,.~... ~: ....,. ......... . _
Home Ofli¢®: Dallns Office: Alia^la Office:
P.O. Box 104 · BoIon Rouo~, LA 70821-0104 P.O. Box 540487 · D~llnn, TX 75354-0487 4000 Oumt~'lnnd Pkwy., Bldg. 800, $1e. A · All~nla, GA 30339
{504) 2gG-~857 · Fnx Ho. (504,) 291-0777 (214) 5,~)-8811 · Fax No. (214) 550-1818 (404) 33,.~0195 · Fax No. (404) ~lgg
Ginn, Incorporated
17103 Preston Road
Suite 100
Dallas, Texas 75248
Attention: Mr. Sanford Case, P.E.
RE: Village Pkwy Pump Station
Open cut installation of
Pipe
flentlemen:
This is an addendum to the cost detail dated February 15, 1989. Material and
installation requirements to work around existing utilities near the Sandy Lake Road
Pump Station and near the intersection of Sandy Lake Road at Kimbel Kourt are as
follows:
Location Descriotion Value
Sandy Lake Road P.S. Add Iea. 14 degree bend @ $1,600.00 each $ 1,600.00
Sandy Lake Road/K.K, Add 1 ea. 87 degree bend @ $2,800.00 each 2,800.00
Both Add 52 1.f. 36" pipe @ 235./1.f. 12,220.00
Sandy Lake Road/K.K. Delete 50 1.f. tunneling @ 300./1.f. (15,000.00)
Sandy Lake Road/K.K. Delete 2 ea. 45 degree bends (3,200,00)
$(1,580.00)
It shall be understood that these necessary measures are to be included as part of
the change order requested.
Please do not hesitate to call should you have any questions.
Sincerely,
CAJy~,CONTRACTORS, INC.
Ned Durbin
Project Superintendent