Loading...
Freeport Xing-PT130213 A copy of the approved permit must be on the job site at all times. CC: Applicant T H. ` C a T Y 0_ . Page 1 of 4 Public Works COI'ELL Permit File Rev. 06/2012 Orig. to Project File. 1-3 -1 3 PO 2:0l. R C V D RIGHT-OF-WAY USE PERMIT APPLICATION Permit valid for 90 calendar days from date of approval Submit permit application to the Engineering Dept.,Town Center,255 Parkway Blvd.or e-mail to engineer @coppelltx.gov(see button below) Date of Submittal: January 31, 2013 Applicant's Job # / Work Order # PERMIT FEE: $100.00 (No charge to Utility Companies with approved Franchise/ROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes C No C ❑ Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work) Project Name/Location or address 777 Freeport Parkway Building Connect General Contractor Future Telecom Contact# Jocko Helmers E-mail address to return permit thomas.capps @zayo.com,jocko @futuretelco.com, charles @tgainc.net Representative: Tommy Capps Franchise Telephone#: o: 817.665.8401 m:214.726.6215 Company: E-mail address:thomas.capps @zayocom (for contact if needed/if e-mail of approved permit is desired/permit cannot be e-mailed unless complete) Utility Company Represented: C Oncor Electric Delivery f Atmos Energy C" Verizon C` SBC/ AT&T {" Time Warner Cable C` CoSery Electric/Gas ( Other AboveNet/Zayo Group General Description of Work(ln-accordancewith;Ord No 2OO1 944) PLEASE ATTACH PLAN OF PROPOSED to,place approximately 250 of 2 1 25'HDPEw/48F cable from an existing AboveNet MH to,cross Bethel Rd to 777 Freeport Pkwy,Coppell TX 441, A Estimated Start Date February 11, 2013 Estimated Completion Date*March 11, 2013 * Completion requires submittal of Completion Verification Notice (see page 4) ,.Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason: f Yes No >Is removal of existing streets, alleys, or sidewalks necessary? r Yes (: No if YES,project must have City inspection prior to concrete replacement Right-of-Wav Use Permit Application Page 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at applicant's expense)and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155. >Any excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department @ 972-304-3600 Fire Department @ 972.304-3512 Street Department a 972-462-5150 Engineering Department @ 972-304-3679 >Attach barricade plan / trench safety plan if a lane or street closure is required. NOTE: Street closures are allowed from 9:00 a.m.until 3:30 p.m.ONLY unless otherwise approved by City Engineer. >Attach Work Order(franchise only)and/or 1 set of prints showing proposed work. Locates for existing franchise utilities must be done 48 hours prior to beginning work. ForrCity utility locates ca 1 972-462 "15 �..1 . �, 5 #o schpclules48 hou prior` to tiegi�ining work rs The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept.for approval prior to beginning work. Submittals by e-mail should go to engineer@coppelltx.gov. Printing your name indicates your acceptance of the terms and conditions of this form: (if you want the approved permit returned via e-mail,provide a valid e-mail address on Page 1.) Tommy Capps January 31, 2013 Signature of Utility Company Representative Date Jocko Helmers January 31, 2013 Signature of Contractor Representative Date —goo S' S .na I re ity Representative Date Comments >NOTE: Notify City Inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. libL, \ ,, \ \ MO \\N ',,, , AboveIetTM N A Subsiderary of Zayo Group 777 FREEPORT PARKWAY COPPELL, TEXAS PREPARED BY: TEEH-7 ioue &ASSOCIATES #13017CS01 NOTE '' 0 777 FREEPORT PARKWAY STA. 0+00 N UTILITY 6 RO.W REPRESENTED ON PLANS ARE BASED Off RECORDS CAUTION: mar ON BOt1i IDARY SURVEY COPPELL, TEXAS SPLICE POINT* 6 FIELD EXPOSURES I CONTRACTOR TO LOCATE & CONTRACTOR TO LOCATE „. . VERIFY EXISTING GAS IN AREA AND CONNECT TO EXISTING PRIOR TO CONSTRUCTION �/ INCLUDE 1 0 MANHOLE NOTE } Z z INCLUDE 1 OQ' SLACK COIL SCALE i"=aD' CONTRACTOR O 1 TO LOCATE f•.. = n AND VERIFY = < cam) CONDUIT AND 0 FIBER PRIOR U TO CONSTRUCTION - CONTRACTOR TO REMOVE N ORIGINA 2.:-,',:•,,.-,,,, AND REPLACE 16 SO. FT. OF • • • I1 OR BETTER CONDITION CONCRETE SIDEWALK TO ORIG 0 Aft,iv-e- . ' 9)\--/ ^;.,.:'_r.y,,}• ® ® - 0 GTE Eaaemen-„ rlor,mot.•,. •.. - AAA 1!T .. la\ T G G G BETHEL ROAD , .7 :T. , ,o' G C 3 tI. G G C C G G WG Farm I gill i -1.•, ,,:,.' ;: :::: • ,-• ':: . , ' :'°•1 # s a 27" RCP CT Q' a s I s s S ED i TA 0+00-STA 2+42 !. 1112 ' — CONTRACTOR D. PLA E 4 Wt N 48 FI ER CABLE M `. S T s T s t T r v 812' TO FREEPORT PARKWAY . . r x ., ;� T :: r s s s T s w......................... ... ..... . . . . . .T :..:•71,==, --,--"":4410-,—,,m.-- t ,—... I#-�.. ..e , ,i^^ 1A1.�.....+ . . .::f■ ,_._ . . . t 3-5 Xt 0 BOX CULVERTS::'':: . . . .. .� is i }..:.. .... *::.......lip �> s ' a ` ,� 5x10' BOX CULVERT \�'..'� ••► a, f i +w • w w w WATER- w—w r w • N w ° • w .. II -w d Id / � W 777 FREEPORT PARKWAY STA 1+56 �--1 '—'� T- ESTIMATED BUILDING ENTRY SHEET TOTALS [ CONTRACTOR TO REMOVE TRENCH DIR. BORE 232' AND REPLACE 15 SO. FT. OF CONCRETE SIDEWALK TO ORIGINA t OPEN CUT OR BETTER CONDITION 12"x12"x6" PE 3'x5'x4' HH 1.25" HDPE 464' �' % ,<`;;;:. f 4" HDPE ;;1",'.'.;. I4" SDR-11 1.25" INNERDUCT CAUTION: REV DESCRIPTION BY APVD DATE nro<a 777 FREEPORT PARKWAY PROJAI Oil. 5" CORE DRILL �,.,w -- COPPfiLL TEXAS CONTRACTOR TO LOCATE & /�+ 48 FIBER CABLE 332' VERIFY ALL EXISTING UTILITIES*" =� m II BUILDING CONNECT 6 ASSOCIATES ■ TO CONSTRUCTION xvonucaaa«,nss axutrtrrt DRAWN TG&A DK M t SO 1 a woranrx .nr s..i.17 K T sNN AvbMF 13017PVD1 REV x twn.Caron m o m Mmr Muw.ttT team APPY L AbOveNet' ...aseonrowaartnrun Tot(O4)42t---0700 0aa REVDA7E Moran'.M�En consort W.ea."en AMOK"CPogIUI m¢ 777 FREEPORT PARKWAY COPPELL, TEXAS a 1+00 ° 2+00 -I I II� u� IIrr WI C 1�� 11 t..'. E I ,, i hI 11 '` ._ _._ II _ A I ' i . l I I I I ! AM • 1 `�!�__. ; it Ii i7,71-7 ix ,f I EXISTING GROUN' 1 _ ' ! OCONDUIT ► AE ' AIll 1 1 H I4% I mrs ' _ —7-4 1 ;I ---, „ „ misii•Nu 1 1 1 li I: I 1 5a 1 ; . 2wr I ' I 1 IlII I®1M iT` ` / I s1 ' I 1 ! I !i I Imo . /1 ! ) i i 1+' Ill ! 11-Th 1 1 NE Li LL:L. 1 L.: 4 I riT.-4-11 119111=11.115.1117111111. ' ,Iir 1 1, Llt ■ ,'! > 5 i i L.\ I i lEr°I A I I i 151 0 + I I li III 1 li : HI I i n I i ( I ! 1 i ( j t l ! i t I ! 1-711 j 1 i I i i ( . i ! I ! I 1 ! -i.. ! ! t ! I i ! t H I ! I ! I I--i! 1 i I III 1 I i l ! DTI I ! I I -1-1 IT , I i llt II Hi ' Ii11 i 1 I ill 1 ' � " I — PROPOSED 2-1251 HOPE _ I ._ IIf I I illy ' Il i W/48 FIBER CABLE — ! I % I _ I , I 1 i—i 1 tllll ITI 1lllll H i1I iiIii 11 PDDlCIT: .POW=CCM REV DESCRIPTION BY APVD DATE ." . 777 FREEPORT PARKWAY ,.:�^ � COPPELL,TEXAS TEC-13 � — BUILDING CONNECT a nssocSwres lima* cx TDS aocuwort DRAWN TG&A 'MC na Dn IS P"cr°ETARY MD DUU nor LWCgT9,••Dmt 13017PV01 A REV SE USED�.REPRODUCED CO wont P.M.OP*0101 APPY AboveNet U< ro�W,C,�x� SuInq xi-noo -DROVED omoOnt 03W caw_oas .REVDATE