Loading...
CF-Sandy Station-CS 861106Charge To: t  Approved for payment Recom~ded -~~F°r Payment BY: m Date Paid  / (~t. He~) "~/ Invoice No - GINN, INC. CONSULTING ENGINEERS CoppeZl~ ~X 75019 Re: Pump Station Improvements Dear Mr. Powell: Enclosed are three copies of Application for Payment No. 3 (Final) the amount of $7,008.60 from Onyx Construction Co., Inc., representing work performed on the above referenced project through September 30, 1986. We have reviewed this application and recommend that payment in full be made at this time. Sincerely, H. Wayne Ginn, P.E. /ss Enclosure cc: Onyx Construction Randy Fleming Kevin Peiffer '- GINN, INC. CONSULTING ENGINEERS November 17, 1986 Coppell, TX 75019 '~ Re: Sandy Lake Road Pump Station I t Dear Mr. Powell: A final inspection of the above referenced project was made by representatives of Ginn, Inc. and the City of Coppell on October 23, 1986. The mechanical and electrical appurtenances were found in compliance with the plans and specifications. A letter of one-year guarantee for all materials and workmanship for this project has not been received yet. Substantial completion of this project was July 2, 1986. The one-year guarantee should start on the July 2, 1986 date. We recommend final payment be issued upon our receipt of the letter of one-year guarantee from the contractor. Please call if you have any questions. Sincerely, //? ' ..f Kevin Petffer /ss cc: Steve Goram R. E. Josserand, Onyx Const. Wayne Ginn Randy Fleniing INC. ( ONSI'LTING EN¢;INEERS November 17, 1986 Mr. Ed Powell',City Engineer P.O. Box 478 Coppell, TX 75019 Re: Sandy Lake Road Pump Station Improvements Project Dear Mr. Powell: A final inspection of the above referenced project was made by representatives of Ginn, Inc. and the City of Coppell on October 23, 1986. The mechanical and electrical appurtenances were found in compliance with the plans and specifications. A letter of one-year guarantee for all materials and workmanship for this project has not been received yet. Substantial completion of this project was July 2, 1986. The one-year guarantee should start on the July 2, 1986 date. We recommend final payment be issued upon our receipt of the letter of one-year guarantee from the contractor. Please call if you have any questions. Sincerely, Kevin Peiffer /ss cc: Steve Gorar. R. E. Josserand, Onyx Const. Wayne Ginn Randy Flen:ing Application for Payment PAYMENT REQUEST NO. THREE SHEET -1 OF 3 FOR WORK COMPLETED THROUGH THE DATE OF: 9-30-86 PROJECT TITLE: SANDY LAKE ROAD PUMP STATION IMPROVEMENTS DATE: 10-14-86 LOCATION: Coppell, Texas DESCRIPTION: Install one 100 HP motor and p~mp w/ electrical appurtenances OWNER/ENGINEER INFORMATION: CONTRACTOR INFORMATION: CONTRACTOR: O~y~ Construction Co., Inc. OWNER: City of Coppe11 ADDRESS: P.O. Box 18765 ADDRESS: p_o. Rr~¥ ~?~ C~/~TATE: ~_ w~rt~ ~ ?6248 C~Y/~TATE: Coppe11, T~a~ 7~01~ CO.ACT ~R~ON: R. ~. CO~A~ ~ON: Ed Powell ~H~E ~.: (817) 439-3335 462-0022 -- PHONE ~.: ~ANCE CO.: ~ited Fidelity ENG~EE~' GI~, INC., ADD~E~: ' CON.TING ENGINEERS AD~E~: 16 135 ~ESTON ~AD, CITY/STATE: ~UITE 10~ CI~/~TATE: DALLAS, TEXAS B~DING AGE~: Hi~hl~d~ ~de~iters CO. ACT PERSON: Kevin Peiffer ADD~E~: 600 Jefferson ~H~E ~.: (214) 38~-6~ 1 1 CITY/~TATE: Ho~ton, ~ 77002 CONTRACT NO.: CONTRACT DATE: PROJECT NO.: TOTAL ORIGINAL cONTRACT AMOUNT: $ .... .~.960.00 TOTAL CHANGE ORDER~: 3 AMOUNT: $ 7,268.00 TOTAL CONTRACT AMOUNT TO DATE: $ 53,228.00 -- NOTICE TO PROCEED DATE: ~y ]9:19R6 COMPLETION TIME: ~.5 CALENDAR DAY8 CONTRACT COMPLETION DATE: July 2, 1956 PERCENT TIME ELAPSED: 100 ~ PERCENT WORK COMPLETED: 100 I~ INVOICE ONYX I~ONSTRUCTION CO., INC, I=.O. BOX 18`765 · F'T. WORTH, TX `76118 · (8!'7) 439-3335 IIOl. O TO BHII=II::IED TO 16135 Preston Rd. Suite 106 RE: Exiting Pump Station Improvements Dallas, Texas 75248 City of Coppell 9__-- 30-- No. Three (3) 100%Complete $ 7,008.60 I 430-t800 GEhJEI~AL CONTRACTOR & EQUIPMENT ~I~TAL P.O. BOX 18765 FORT WORTH. TEXAS 761 t8 HAME OF PROJECT City of Coppell Existing Pump Station Improvements ESTIMATE PERIOD: FROM Aug. 20, 1986 TO Sept. 30~ 1986 CONTRACTOR ONYX CONSTRUCTION CO., IHC. CONTRACT AMOUNT S 45,960.00 AMOUNT ESTIMATE 53,228.00 # I 831. O0 CHANGE ORDER 2 1~861..00 RETAINAGE -0- 3 4,576.00 TOTAL CONTRACT AMOUNT $3~228.00 LESS PREVIOUS PYMTS 46,219.40 TOTAL THIS ESTIMATE 7~008.60 DESCRIPTION UNIT UNIT C. ONTRACT _RORK' DONE AMOUNT PRICE .PRICE .~D DATE Electrical C.I.P. (l'nc]. 'instrumen- tation ) LS 15,500,00 10 0 15,5 0 0.0 0 High service pump w/motor (100HP) w/appurten. 1 EA 20,210.00 100 20,2 10. O0 12" D.I. flanged Class 51 C.I,P, 41 LF 4,100,00 100 4,100.00 12' 90° D.f, long rad, base bend (flanged) C.I.P. 1 EA 750,00 100 750.00 12" x 10" reducer D.I. (flanged)C.I.P, 1 EA 500.00 100 500.00 10" x 90° bend D.I. [flanged) C.I.P. 1 EA 300,00 100 300.00 10" gate valve D.I. (flanged) C.I.P. I EA 900,00 100 I 900.00 t 2,500.00 100 10" check valve D.I. ('flanged) C.I.P.i i EAI 2,500.00 Pressure gauge (0-200 psi) J I EA 200.00 100 200 O0 3" air release valve C.I.P. , ' EA i,000.00 100 1 , 000 · 00 Chan~e Otder Xo. 1 I Install 17" '~]~,,, x. ~.. , ~ , _ ,~ ox 831.00! 100 831. O0 Change Order No. 2 L.S. 1,861.00' 100 1,861.00 Change Order No. 3 L.S. 4,576.00 100 4,576.00 ONYX(/~ONSTRUCTION CO., I~NC. .P~(~,JECT: SANDY LAKE ROAD Po~fP STATION IMPROVEMENTS AHEET 3 O~ 3 · PAY~.~T MO. THREE Accompanying Documentation: GROSS AMOUNT DUE ......... $ 53~228.00 L _ LESS 5 ~ RETAINAGE ..... $ -0- AMOUNT DUE TO DATE ....... $ 53,228.00 " LESS PP, EVlOUS PAYMENTS... $ 46,219.40 __ A~Ob'NT D~3E TMIS A~PLICaTIC~ $ 7,008.40 REVIEWED BY: ,~f-/ DATE: CHECKED IY: ~P DATE: The undereisned C~BFrIACT/R certifies ~hdt (1) 811 pravioue prosress ~ntl ~cei~ f~om ~ on ~c~t ~ ~rk ~ ~r ~ ~tract referr~ to ~ve ~ve ~ ~li~ to dllchr~ in full by prior Mli~ttm for _ ~11 mterials ~ ~ui~t t~rat~ 1~ Mid ~rk or ~~ listed tn ~ cmr~ by chis ~licettm for Prat ~11 ~ ~ ~ 8t ~ of ~nt f~e ~ cl~r of all liens, claiM. ~ity ~ceptable to ~). C0NSr UCrION This ipplic&tion (~tth ~cco,~anying doc,,~ntetion) mrs t~ requ/r,,~nts of t~ ~ntract ~c~ntl k ~t of t~ ~e ~T ~ ~lS ~I~TI~ il rec~ed. hied 19 ~ CI~ INC. CONSULTING ENGINEERS ..... hy req~st recei~ ~mr/~.~/ ~/ /q~ by .~ , _ ' ~ · ' TI~ Application for Payment ~AYMENT REQUEST NO. THREE SHEET ri OF 3 FOR WORK COMPLETED THRQUGH THE DATE OF: 9-30-86 PROJECT TITLE: SANDY LAKE ROAD PUMP STATION IMPRO~S DATE: 10-14-86 LOCATION: Coppell, Texas DESCRIPTION: Install one 100 HP motor and pump w/ electrical appurtenances OWNER/ENGINEER INFORMATION: CONTRACTOR INFORMATION: CONTRACTOR: Onyx Construction Co., Inc. OWNER: City of Coppe~! ADDRESS: P.O. Box 18765 ADDRESS: p_o. ~¥ ~TR CITY/STATE: Et. w~rth~ TX 76248 CITY/STATE: Coppell, Texas 75019 CONTACT PERSON: R. E. $osserand CONTACT PERSON: Ed Powell PHONE NO.: (817) 439-3335 -- *HONE NO.: 462-0022 ~URANCE CO.: United Fidelity ENGINEER: GINN, INC., ADDRESS: CONS~ILTING ENGINEERS ADDRESS: 16 135 PRESTON ROAD, CITY/STATE: SUITE 106 CITY/STATE: DALLAS, TEXAS BONDING AGENT: Hi_~hlands Underwriters CONTACT PERSON: Kevin Peiffer ADDRESS:. 600 Jefferson PHONE NO.: (2 14) 386-66 1 I CITY/STATE: Houston, TX 77002 CONTRACT NO.: CONTRACT DATE: PROJECT NO.: TOTAL ORIGINAL CONTRACT AMOUNT: $ _.~45~_t960. O0 TOTAL CHANGE ORDERS: 3 AMOUNT: $ 7,268.00 TOTAL CONTRACT AMOUNT TO DATE: $ 53,228.00 --.NOTICE TO PROCEED DATE: Nay lg: lgg~ COMPLETION TIME: 4S CALENDAR DAY8 CONTRACT COMPLETION DATE: July 2, 1986 PERCENT TIME ELAPSED: 100 · PERCENT WORK COMPLETED: 100 INVOICE ONYX CONSTRUCTION CO., INC. I~.0. BOX 18765 · I'T. WORTH, TX 8OLD TO 16135 Preston Rd. Suite 106 RE: Exiting Pump Station Improvements Dallas, Texas 75248 City of Coppell 9 : 30:8 7,0'08.60 439-3335 a30-1800 GEt'~ERAI_ C. ONTRACTOR ~ EQUIPMENT P. O. BOX 18765 ~'C'.,RT WORTH. TEXAS 761 t8 NAME OF PROJECT City of Coppell Existing Pump Station Improvements ESTIMATE PERIOD' FROM Au§. 20, 1986 TO Sept. 30~ 1986 CONTRACTOR ONYX CONSTRUCTION CO., IHC. CONTRACT AMOUNT S 45,960.00 AMOUNT ESTIMATE 53,228.00 # 1 831. O0 CHANGE ORDER 2 1~861.00 RETAINAGE -0- 3 4,576.00 TOTAL CONTRACT AMOUNT 53,228.00 LESS PREVIOUS PYMTS 46,219.40 TOTAL THIS ESTIMATE 7~008.60 DESCRIPTION UNIT UNTT C. ONTRAC? _I~ORK' IX)hE AMOUNT PRICE .PRICE .~'~0 DATE Electrical C. !.P, C~ncl ~ 'fnstrumen- tatfon } LS 15,500, O0 1 O0 15,5 00. O0 - ltigh service pump w/motor (IOOHP) w/appurten. 1 EA 20,210,00 100 20,210. O0 12" D.I. flanged Class 51 C.I,P, 41 LF 4,100,00 100 4,100.00 12' 900 'D.t. long rad, base bend (flanged) C.I.P. ]EA 750,00 100 750.00 12" x 10" reducer D.I. (flanged)C.I.P. 1 EA 500.00 100 500.00 10" x 90o bend D.I. Cflanged) C.I.P. 1 EA 300,00 100 300.00 10" gate valve D.I. (flanged) C.I.P. 1 EA 900,00 100 900.00 10" check valve D.I. ('flanged) C.I.P. I I EA 2,500.00 100 2,500.00 Pressure gauge (0-200 psi) t ! EA 200.00 100 200.00 3" air release valve C.I.P. I 1 , 000 · O0 Chan~e O~der No. ] Install 12" Valve & Rm,- I, ~a ~ ...... lmm : 831.00! 831.00 Change Order No. 2 iL.S. 1,861.00' 100 1,861.00 _ Cha. nge Order No. 3 L.S. 4,576.00 100 4,576.00 ONYX.4ONSTRUCTION CO., INC. · .P~O_4F~CT: SANDY LAKE ROAD PO~iP STATION IMPROVEMENTS ~e~EET 3 ~: 3 PAY~.[~' MO. THREE Accompanying ~ocuBen~ation: GROSS AMOUNT DUE ......... $ 53,228.00 ~ - LESS 5 I RETAINAGE ..... $ -0- ~NOUI~ DUE TO DATE ....... $ 53,228.00 " LESS PREVI~S PAYMENTS... $ 46,219.40 __ ~IOUNT ~UE THIS APPLICATIO~ $ 7,008,40 REVIEW ED BY: ~// D ATE: IO/5-//~ CHECKED BY: /(:/~P DATE: /~/f.Y'//~/ The undersis~ed ~~ certifies tJmt (1) 811 previous prosreos pll~ents received fxom ~ ~ ~c~t of ~rk ~ ~r ~ ~tract referr~ to ~ve ~ve ~ ~plig to by prior ~licitim for ~t ~rg I ~r~ 3 ~lusive; ~ (2) title tc ~y ~his ~lic~rt~ for P~ ~11 ~ ~ ~ at t~ of ~nt f~ ~ cl~r ~ -all l~ens, clai~, ~~y ~~s ~ ~r~es (except ~ch ~ c~r~ by ~ ~t~ ~/~O/, 1~ ~ O~X CONSTRUCTION CO~ Yhis Application (with ~cc~nyi~ ~oc~ntotiom) ~eets t~ r~r~nts of t~ ~ted 1~ ~ _ .~I~, INC. CONSULTING ENGINEERS