Loading...
Shake & Shingle 3-CS130215 T H E • C 1 T Y O F COPPELL q A 8 t February 15, 2013 Ryan Martin Ratcliff Constructors RE: Shake & Shingle Addition, Phase 3 Dear Mr. Martin: A pre-construction conference on the referenced project has been scheduled for Thursday, February 21, 2013 at 9:00 a.m. in the Lobby conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at(972) 304-3684. Sincerely Larry Davis, instruction Inspector Office Phone: 972-304-3684 Fax: 972-304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Michael Garza, P.E., Civil Engineer Michael Arellano, Chief Building Official Lee Stone, Commercial Building Inspector Tim Oates, Deputy Chief/Prevention 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 2 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner/ owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner/owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative