Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CF-Village-CS 890212
SUMMARY OF FUNDED WATER/SEWER PROJECTS AND COST ESTIMATES Project Estimated Project Cost 1. 24" RCCP Waterline 2,000,000.00 2. 10MGD Pump Station 3,000,000.00 3. 5MGD Ground Storage Tank 1,936,000.00 Total Estimated Project Costs 6,936,000.00 20