Loading...
CF-Village-CS 890130GINN, INC. CONSULTING ENGINEERS January 30, 1989 Engineering Department Dallas Water Utilities 320 East Jefferson Dallas, Texas 75203 Re: Village Parkway Pump Station City of Coppell, Texas Dear Mr. Kester: The City of Coppell has begun construction on the above referenced project with a scheduled completion date of November 22, 1989. The contractor for this project is Cajun Contractors, Inc. of Baton Rouge, Louisiana. As you are aware, this project involves several modifications to the existing Rate-of-Flow controller on Sandy Lake Road. Per our conversation of January 25, 1989, we will be forwarding all submittals which involve DWU equipment to you for approval. At this time, we are transmitting eight (8) copies of the following for your approval: 1) Turbine Meter and Strainer Please return three (3) approved copies to our office. We will then release the approved submittals to the contractor. We are also enclosing three (3) sets of Sheet 42 and 43 for this project. These sheets involve the modifications to the DWU facilities. If you have any questions or if we can be of further assistance, please feel free to contact us. Thank you for your prompt attention to this matter. Sincerely, Sa~ford W. Case, P.E. enclosures cc: ~~... H. Wayne Ginn, P.E. Steve Goram · File 380 Phil Boyd, Dallas Water Utilities 17103 Prcston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900