Loading...
Burch Lot 3-CS 950517KWIK INDUSTRIES, INC. Inv No Inv Date Amount Vendor: COPPELL, Inv No TX/CITY OF Inv. Date Amount 6928 !TR MF'ACT 05/17/95 MPACT 05/17/95 450.00 Check Date 05/17/95 Check Amount 1,350.00 ONE PAY TO THE ORDER OF KWIK INDUSTRIES, INC. 4725 NALL RD. PH. 214-458-9761 DALLAS, TEXAS 75244 THOUSAND THREE HUNDRED FIFTY AND NO/100 CITY OF COPPELL, TEXAS P.O. BOX 478 COPPELL, TX 75019 STATE BANK & TRUST DALLAS 32-1574-1110 6928 05/17/95 *******$1,350.00 DATE AMOUNT 00~ 58 Et,' CITY OF COPPELL DEVELOPMENT FEES Date: May 10, 1995 Project: Butch Addition Lot 3 Blk. A TOTAL AMOUNT DUE FEE~ DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 900.00 900.00 (100% due prior to Council Approval) Water Tap Inspection Fee 200.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 450.00 450.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 22.25 (100% due at Issuance of Water Meter) Water Meter.Deposit 70.00 (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) 22.25 (100% due at Issuance of Water Meters) Irrigation Meter Deposit (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100 % due prior to Acceptance of Project) available Park Fee (50% due prior to Council Approval) (50% due prior to Issuance of Building Permit) Street Escrow (100% due prior to council Approval) Construction Inspection Fee need submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $1,714.50 $1,350.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL ENGINEERING MEMORANDUM DATE: TO: FROM: RE: .May 4, 1995 Mike Martin, E.I.T. Howard Pafford, Utilities Superintendent Development Fees for Burch Addition Lot 3 Blk.A 'The following fees should be referenced project. Water Impact Fee: (Revised) assessed and collected on the above - 5/8 x 3/4" Domestic Meter/s = 1 ESU's - 5/8 x 3/4" Irrigation Meter/s = 1 ESU's Total 2 . ESU's ~ $450.00 ea = $ 900.00 100% due prior to Council approval of the final plat. Wastewater Impact 1 - 5/8" x 3/4" Domestic Meter/s = Total 1 ESU's ~ $450.00 ea = 1 ESU's 450.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections @ $100.00 each = $ 200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Deve2opment Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/lot = $ 50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 5/8 x 3/4" Domestic Meters @ 22.25 ea = $ 22.25 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 5/8" x 3/4" Irrigation Meter/s @ $ 22.25 100% due prior to issuance of water meter/s. = $ 22.25 Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters @ $35.00 ea. = S 70.00 100% due prior to issuance of water meters.  he City With A Beautifui Future i RECE-IVEID- 1995 [ MAY 17 1995 May 10, /I3%,:-..__~. _ P.O. Box 478 Coppell, Texas 75019 214-462-0022 Dowdy Anderson & Associates 16250 Dallas Parkway Suite 100 Dallas, Texas 75248 RE: Burch Addition Lot 3 Blk. A Development Fee Assessment f~/J.~/.95 Dear Sir: Enclosed is a copy of the City of Coppell Development Fee Assessment list?along with a copy of the Development Fee Calculations for the Burch Addition Lot 3 Blk. A. / Please make payment to the City of Coppell in the amount of $1,350.00/and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the~ngineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified.~wia. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to wor~ng with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Assista~anager/City Engineer CC: Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager