Loading...
Cambridge Phase 1-LR 941014 G EOTECHNICAL ENGINEERING GEE Consultants, inc. 2540 Glenda Lane · Suite 10g · Dallas, Texas 75229 · (214) 620-9791 · [ax i214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: October ].4, ].994 Date Concrete Placed: October 6· ].994 Standard 6'x12" Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor· Phase I Conerete ReportNo.: 24 Contractor: Site Concrete Concrete Supplier and Plant: Site Concrete/On Site Location of Placement: Cambridge Manor Lane Pavement s~' SSD..,chw,~. INSPECTION DATA MAT ERIAL S ~ ~LI~.CuYd, Mix Number: Time Sample Batched: pm Cement: Time Sampled: 5:00 pm Sample Location: Station 1 +50 Fly Ash: Track;Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 85°F Fine Aggregate: Concrete Range: 83°F Admixtures: Slump Range (inches): 2" Weatiter Conditions: Partly Cloud}' I Time Started: 8:15 am 2 Time Completed: 5:45 pln Added Water: Sample Air Content (%): 3.0 Total Cubic Yards Placed: Required Strength (Lbs.:sq.in.): 3.000 Sw~.-.-mn Measunxi Age Da~ Taal Load Co,npr~ssixx St.-~n~th R~war~ N~r SI~ .h.: ~>s) T~ .'L~.~ :Lb. Sa.h.. EC~ 79 2" 7 10/~3/94 95,920 3,390 ECM 80 2" 7 10/13/94 99·480 3,520 ECM 81 2" 28 11/03/94 ECM 82 2" 28 11/03/94 T~s~ Me~ lJ6l~ Fra~ R~g'~ar A~M C-31.C-39,C-ia3 ,L'~s X~ O~r~:~ Cylinders Made By: P. M. Remarks and:or Distribution: cc: Bill Anderson - Dowdy. Anderson and Associates, Inc. M~Davis-CityofCoppell ~~~ ~ ~~~/~ ~ . ~ ~nsuIt~ts, Inc. Reviewed by: All :,-,,t~vs and mpor,,s am for ',h= excluaix~ us~ of u~ client to v. hom th:y am addre, sse~i and shall nol b: repr~uced v. itho~ ~ bail approval of GEE C~-n,aultants. L~c. Th~ :~: of our nam~ o~r r--riot writ'.en aFpro,,al. Our letters and reports ap~]y cs.ly to '.he samp~ Uesl~d aixL ca' i:zipe~ct~d and a.~ aol .'~cgssarlJy illdicatlVe of Ih~ quaiah~s ef appamntl.', identk'a; er similar