Cambridge Phase 1-LR 941014 G EOTECHNICAL
ENGINEERING GEE Consultants, inc.
2540 Glenda Lane · Suite 10g · Dallas, Texas 75229 · (214) 620-9791 · [ax i214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: October ].4, ].994 Date Concrete Placed: October 6· ].994 Standard 6'x12"
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor· Phase I Conerete ReportNo.: 24
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete/On Site
Location of Placement: Cambridge Manor Lane Pavement
s~' SSD..,chw,~. INSPECTION DATA
MAT ERIAL S ~ ~LI~.CuYd,
Mix Number: Time Sample Batched: pm
Cement: Time Sampled: 5:00 pm
Sample Location: Station 1 +50
Fly Ash: Track;Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 85°F
Fine Aggregate: Concrete Range: 83°F
Admixtures: Slump Range (inches): 2"
Weatiter Conditions: Partly Cloud}'
I Time Started: 8:15 am
2 Time Completed: 5:45 pln
Added Water: Sample Air Content (%): 3.0
Total Cubic Yards Placed:
Required Strength (Lbs.:sq.in.): 3.000
Sw~.-.-mn Measunxi Age Da~ Taal Load Co,npr~ssixx St.-~n~th
R~war~
N~r SI~ .h.: ~>s) T~ .'L~.~ :Lb. Sa.h..
EC~ 79 2" 7 10/~3/94 95,920 3,390
ECM 80 2" 7 10/13/94 99·480 3,520
ECM 81 2" 28 11/03/94
ECM 82 2" 28 11/03/94
T~s~ Me~ lJ6l~ Fra~ R~g'~ar
A~M C-31.C-39,C-ia3 ,L'~s X~ O~r~:~ Cylinders Made By: P. M.
Remarks and:or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates, Inc.
M~Davis-CityofCoppell ~~~ ~ ~~~/~ ~ .
~ ~nsuIt~ts, Inc. Reviewed by:
All :,-,,t~vs and mpor,,s am for ',h= excluaix~ us~ of u~ client to v. hom th:y am addre, sse~i and shall nol b: repr~uced v. itho~ ~ bail approval of GEE C~-n,aultants. L~c. Th~ :~: of our nam~ o~r r--riot writ'.en aFpro,,al. Our letters and reports ap~]y cs.ly to '.he samp~ Uesl~d aixL ca' i:zipe~ct~d and a.~ aol .'~cgssarlJy illdicatlVe of Ih~ quaiah~s ef appamntl.', identk'a; er similar