Cambridge Phase 1-LR 941014 (2)G EOTECHNICAL
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax i214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: October 14, 1994 Date Concrete Placed: October 6, 1994 Standard 6"x12'
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Conerete Report No.: 23
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete/On Site
Location of Placement: Cambridge Manor Lane Pavement
MATERIALS so.,~.- ss~ ~.~,v,-,. INSPECTION DATA
D~script!on :Lb~-CuYd!
Mix Number: Time Sample Batched: 2:05 pm
-.l. pm
Cement: Time Sampled:
Sample Location: Station 5 * 70
Fly Ash: Truck;Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 81 °F
Fine Aggregate: Concrete Range: 80°F
Admixtures: Slump Range (inches): 2
Weather Conditions: Partly Cloud}', Wind}'
I Time Started: 8:15 am
2 Time Completed: 5:45 pm
Added Water: Sample Air Content (%): 4.5
Total Cubic Yards Placed:
Required Strength (Lbs.;sq.in.): 3,000
$~n .Mle. a~u~d Age Da~c Total Load Core. prcssiv¢ Strength
Ken-.ar k~
ECM 75 2½ 7 10/13/94 100,160 3,540
ECM 76 2½ 7 10/13/94 97,600 3,450
ECM 77 2% 28 11/03/94
ECM 78 2½ 28 11/03/94
ASTM C-31.C-39.C-;a3 .t'nlca, ~ot,~ Othc~ Cylinders Made By: R. G.
Remarks and:'or Distribution:
cc: Bill Anderson - Dowdy, Anderson and Associates. Inc.
Larry Davis - City of Coppell
GEE Consultants, Inc. Reviewed by:
All :ct,cvs and repo,.s are for ~ cxclcaive u~e of the cF. cm to *,horn tl~.~- ave add~e, ss*d and shall n~ ~ ~p~uced w?.hom th,: ,5~1 apprc~-al or' GEE Ccn~.suhan. ts. Inc. Thc =~ of our :amc