Loading...
Cambridge Phase 1-LR 941014 (2)G EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax i214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: October 14, 1994 Date Concrete Placed: October 6, 1994 Standard 6"x12' Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Conerete Report No.: 23 Contractor: Site Concrete Concrete Supplier and Plant: Site Concrete/On Site Location of Placement: Cambridge Manor Lane Pavement MATERIALS so.,~.- ss~ ~.~,v,-,. INSPECTION DATA D~script!on :Lb~-CuYd! Mix Number: Time Sample Batched: 2:05 pm -.l. pm Cement: Time Sampled: Sample Location: Station 5 * 70 Fly Ash: Truck;Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 81 °F Fine Aggregate: Concrete Range: 80°F Admixtures: Slump Range (inches): 2 Weather Conditions: Partly Cloud}', Wind}' I Time Started: 8:15 am 2 Time Completed: 5:45 pm Added Water: Sample Air Content (%): 4.5 Total Cubic Yards Placed: Required Strength (Lbs.;sq.in.): 3,000 $~n .Mle. a~u~d Age Da~c Total Load Core. prcssiv¢ Strength Ken-.ar k~ ECM 75 2½ 7 10/13/94 100,160 3,540 ECM 76 2½ 7 10/13/94 97,600 3,450 ECM 77 2% 28 11/03/94 ECM 78 2½ 28 11/03/94 ASTM C-31.C-39.C-;a3 .t'nlca, ~ot,~ Othc~ Cylinders Made By: R. G. Remarks and:'or Distribution: cc: Bill Anderson - Dowdy, Anderson and Associates. Inc. Larry Davis - City of Coppell GEE Consultants, Inc. Reviewed by: All :ct,cvs and repo,.s are for ~ cxclcaive u~e of the cF. cm to *,horn tl~.~- ave add~e, ss*d and shall n~ ~ ~p~uced w?.hom th,: ,5~1 apprc~-al or' GEE Ccn~.suhan. ts. Inc. Thc =~ of our :amc