Cambridge Phase 1-LR 941014 (3)IG EOTECHNICAL
ENGINEERING GEE Consultants, Inc.
E INVIRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214~ 620-9791 · Fax i214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: October 14, 1994 Date Concrete Placed:' October 6, 1994 Standard 6'x12"
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Con~rete Report No.: 22
Contractor: S itc Concrete
Concrete Supplier and Plant: Site Concrete/On Site
Location of Placement: Kings Canyon Court
MATERIALS
D,:s crl..~io, CL~.'C~ydl INSPECTION DATA
Mix Number: Time Sample Batched:
Cement: Tim~ Sampled: l 1:38 am
Fl3' Ash: Sample Location: Station 1--50
Truck/Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 80°F
Fine Aggregate: Concrete Range: 80°F
Admixtures: Slump Range (inches):
Weather Conditions: Partly Cloudy
I Time Started: 8:15 am
2 Time Completed: 5:45 pm
Added Water: Sample Air Content (%):
Toull Cubic Yards Placed:
Required Strength (Lbs./aq.in.): 3.000
SpccL,'e~n .M~asu.n~d Ag~ Dat~ Total Lo~ Cmnpmssi~ S:~nguh
Nt..-~b~r S!~'n?-%.: :Da_~ si Tesu=cl ,'Lb~.; {Lbs. Sq.ln.)
ECM 71 2½ 7 10/13/94 93,940 3,320
ECM 72 2½ 7 10/13/94 87,160 3,080
ECM 73 2% 28 11/03/94
ECM 74 2% 28 11/03/94
Te~t Methods Utilized Fra,.'~um R¢§uhr
A.%q'M C-31.C-39.C-143 ,UrAess Ne~a O'.h:r..-is~, Cylinders Made By: G. H.
Remarks and/or Distribution:
cc: Bill Anderson = Dowdy, Anderson and Associates. Inc.
GEE ~onsuXtants, Inc. Reviewed by:
AU I't'~r~ and ~7ort$ am for '.hr cxc|u~ivc usc of '3~ cliem ~o whom L~gy am add.-ca~d and shah r,~ h: ~?roduc~a witho~a th~ full appr~.'a] of GEE Constu'.ants. [nc. Thc u~g of cxtr nan~ mu.st
our prior ~'ritten appr~,'al. Omr icrC:rs and ~potn$ apply c~iy to ~ sample t~amd anti:or in~w.,.-n~ and an r~ necessarily indicati¥= of ~ .qtacntitie~ of atyoa~mlv !d,~nti~a; or sirmlar ~roduc'.s.