Loading...
Cambridge Phase 1-LR 941014 (3)IG EOTECHNICAL ENGINEERING GEE Consultants, Inc. E INVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214~ 620-9791 · Fax i214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: October 14, 1994 Date Concrete Placed:' October 6, 1994 Standard 6'x12" Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Con~rete Report No.: 22 Contractor: S itc Concrete Concrete Supplier and Plant: Site Concrete/On Site Location of Placement: Kings Canyon Court MATERIALS D,:s crl..~io, CL~.'C~ydl INSPECTION DATA Mix Number: Time Sample Batched: Cement: Tim~ Sampled: l 1:38 am Fl3' Ash: Sample Location: Station 1--50 Truck/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 80°F Fine Aggregate: Concrete Range: 80°F Admixtures: Slump Range (inches): Weather Conditions: Partly Cloudy I Time Started: 8:15 am 2 Time Completed: 5:45 pm Added Water: Sample Air Content (%): Toull Cubic Yards Placed: Required Strength (Lbs./aq.in.): 3.000 SpccL,'e~n .M~asu.n~d Ag~ Dat~ Total Lo~ Cmnpmssi~ S:~nguh Nt..-~b~r S!~'n?-%.: :Da_~ si Tesu=cl ,'Lb~.; {Lbs. Sq.ln.) ECM 71 2½ 7 10/13/94 93,940 3,320 ECM 72 2½ 7 10/13/94 87,160 3,080 ECM 73 2% 28 11/03/94 ECM 74 2% 28 11/03/94 Te~t Methods Utilized Fra,.'~um R¢§uhr A.%q'M C-31.C-39.C-143 ,UrAess Ne~a O'.h:r..-is~, Cylinders Made By: G. H. Remarks and/or Distribution: cc: Bill Anderson = Dowdy, Anderson and Associates. Inc. GEE ~onsuXtants, Inc. Reviewed by: AU I't'~r~ and ~7ort$ am for '.hr cxc|u~ivc usc of '3~ cliem ~o whom L~gy am add.-ca~d and shah r,~ h: ~?roduc~a witho~a th~ full appr~.'a] of GEE Constu'.ants. [nc. Thc u~g of cxtr nan~ mu.st our prior ~'ritten appr~,'al. Omr icrC:rs and ~potn$ apply c~iy to ~ sample t~amd anti:or in~w.,.-n~ and an r~ necessarily indicati¥= of ~ .qtacntitie~ of atyoa~mlv !d,~nti~a; or sirmlar ~roduc'.s.