Cambridge Phase 1-LR 941014 (5)G EOTECHNICAL
ENGINEERING GEE Consultants, Inc.
E [ NVIRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas. Texas 75229 · (214'~ 620-9791 · Fax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: October 14, 1994 Date Concrete Placed: October 6, 1994 Standard 6"xi2"
Client: Beamer Development Corporation Area 9_8.~c; Square Inches
Project: Estates of Cambridge Manor, Phase I Conerete Repo~No.: 20
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete/On Site
Location of Placement: Cambridge Manor Lane Pavement
MATERIALS so,.=, ss~a,,~w,,. INSPECTION DATA
Dcscrpro~ .'Lbs. CuYd~
Mix Number: Time Sample Batched: am
Cement: Time Sampled: 8:45 am
Fly Ash: Sample Location: Station I0+00
Truc k,Ticket No:
Coarse Aggregate: Temperature:
Intermediat~ Aggregate: Ambient Range: 74°F
Fine Aggregate: Concrete Range: 75°F
Admixtures: Slump Range (inches): 5 9~
Weather Conditions: Cloud}'
I Time Star,ed: 8:15 am
2 Time Completed: 5:45 pm
Added Water: Sample Air Content (G): 3.5 .~.
Total Cubic Yards Placed:
Required Strength (Lbs..'sq.in.~:
$l:~-4.n'~n Mcasu~:xl Age [')att Total D-',ad C.--~.~.=~.,: St,mgth
Rcmark~
Numar Slmvo ,Ln.! :Da?s Teauxl {l.bs., 'L'.'~. gq.in.,
ECM 63 5¼ 7 10/13/94 98,140 3,470
ECM 64 5¼ 7 10/13/94 92,960 3,290
ECM 65 5¼ 28 11/03/94
ECM 66 5¼ 28 11/03/94
Teat Mcu"~ t.!tiliz~d F.--actu~ Regular
ASTM C-31.C-39,C-143 ;t'.~css .'qo~d O'.t~r~.-:--,e, Cylinders Made By: G. H.
Remarks and;or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates. In,:.
Larry. Davis-City ofCoppellY~~, & ~, .~, ~_.
GEE Consultants, Inc. Reviewed by:
All [ette~ and .-e.~otxs ,tn: for iF= exclmiY* us~ of ~ cl[=m :o ~.hom uh=y ar= addresaed and shall nol be reproduced e. ithout th= ~all approval of GEE C~_"nsul,.anu. Inc. Th= ~x~ cf out name m'.~l :=ceive
out prim' v, rittcn a..m~oxal. Our le:~er~ and repor..s a.~-p~y only lo ~ s~mp~e ~cstcd and:or inspe.~xl and arc .-k-'n ncccssariiy ~dican,.e ef