Cambridge Phase 1-LR 941013 G EOTECHNICAL
ENGINEERING GEE Consultants, inc.
2540 Glenda kane · Suite 10g · Dallas, Texas 75229 * ~214'! 620-9791 · Fax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: October 13, 1994 Date Concrete Placed: October 5, 1994 Standard 6"x12'
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 19
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete'/On-Site
Location of Placement: Cambridge Manor Lane Pavement
MATERIALS s .... - ssoai,chw,~. INSPECTION DATA
Dc,script [c-n : Lbs.'CuYd'~
Mix Number: Time Sample Batched: 4:25 pm
Cement: Time Sampled: 4:35 pm
Fly Ash: Sample Location:
Trucbq'icket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 92°F
l:ine Aggregate: Concrete Range: °F
Admixtures: Slump Range finches) 2t,.:
Weather Conditinns: Clear
I Time Started: 6:45 am
2 Time Completed: 5:00 pm
Added Water: Sample Air Content ;%1 No test
Total Cubic Yards Placed: 750.0
Required Strength (Lbs.;sq.in.): 3.000
Sg~.~n Mcasu.-~l Age Dau~ Total L.oa~ Cotlmpi~a$ix~ Str~rlgth
Remarks
N~nxbcr S'.u~np ,~n.s ,Da?si Tes'.~d ILbs.) ;L~. Sq.L~.~
ECM 59 2¼ 7 10/12/94 55,700 1,970
ECM 60 2¼ 7 10/12/94 70,100 2,480
ECM 61 2¼ 28 11/02/94
ECM 62 2¼ 28 11/02/94
Test M¢'.hocls tJtil~xt Fractu~ Reguh:
A.'TrM C-31.C-39,C-1a3 -t.'~e,s ~:~,tod O'.~'i~, Cylinders Made By: P. M.
Remarks and/or Distribution:
Bill Anderson- Dowdy, Anderson and Associates. Inc.
Al.' :ct:cvs and rcpcn-.s arc for thc exclusive usc of ',lac cilcn: ~o ,a.',hom ~.he,':.' am addrcssext and shall not b~ .-cp.n.,du~d .a.'i'.houl b.hc furl apprmai of GEE Comuitan..s, [nc. 'Em u:,c ef om' r. amc mast
ora' prior ,a.'rit,.e'n ale'p."o'.-al. Out !ct'.c,m and relpC,r~ aFp~y only :o ',~ sample :ested and'or k,~po.*.cd and a,-c not r~ce.,s.~afi!)- kndlcativc of ~ quaint:ica of aggarcnt'5 iden:icai et s'~.Jlar products.