Cambridge Phase 1-LR 941013 (2) G EOTECHNICAL
ENGINEERING GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax 1214~ 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: October 13, 1994 Date Concrete Placed: October 5, 1994 Standard 6"x12'
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 18
Contractor: Site Concrete
Concrete Supplier and Plant: Site Concrete/On-Site
Location of Placement: Cambridge Manor Lane Pavement
MATERIALS s,~,~, ss~ B.,~ v,'~,. INSPECTION DATA
Deseriptio~x :.Li~-'CuYd~
Mix Number: Time Sample Batched: 2:25 pm
Cement: Time Sampled: 2:35 pm
Sample Location: At coruer
Fly Ash: TrucL'Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 90°F
Fine Aggregate: Concrete Range:
Admixtures: Slump Range (inches):
Weather Conditions: Clear
1 Time Started: 6:45 am
2 Time Completed: 5:00 pm
Added Water: Sample Air Content (~): No test
Total Cubic Yards Placed: 600.0
Required Strength (Lbs.;'sq.in.): 3.000
Sl:ec~en 5.1easu~ed Age Dat~ To'.ai Load Corapressiv¢ Streugth
Remarks
N umber Siam..p ;in.: : Da:. s ~ Tes,.ed : L~. ~ ;Lb~. 'Sq. LR.;
ECM 55 4½ 7 10/12/94 78,500 2,780
ECM 56 4½ 7 10/12/94 84,080 2,970
ECM 57 4% 28 11/02/94
ECM 58 4½ 28 11/02/94
Test .Me',hod~ Utikized F.'ac~u~ Reg~ar
ASTM C-?I.C-39.C-143 ,Unle$~ ~:o~ OC',~.~i~, Cylinders Made By: P. M.
Remarks and/or Distribution:
cc: Bill Anderson- Dowdy. Anderson and Associates. Inc.
GEE ~onsultants, Inc. Reviewed by: -
All ~ett~m a~l .~ports at~ fo~ ~ exclusi~ u.~ of th~ ciiera to ~.hem ~e? ,u~ addms.~d and ~l-.a;I ~ be reproduced wi'.hout out p.qor ~.fi:t=n apprc~.,aL Out l¢:~rs and ~po.~ a.m21y only to the sampk= teated ard.'or L~pec~d and a~