REPORT OF CONCRETE MIX INSPECTION
Report Date: October 13, 1994 Date Concrete Placed: October 5, 1994 Standard 6"x12"
Client: Beamer Development Corporat ion Area 28_n-? Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 17
Contractor: Site Concrete
Concrete Supplier and Plato: Site Concrete/On-Site
Location of Placement: Cambridge Manor Lane Pavement
s ..... s.s~ ~,~w~,. INSPECTION DATA
MAT ER I AL S m~.¢,i~ ;Lb~ CuYd,
Mix Number: Time Sample Batched: I:00 pm
Cement: Time Sampled: 1:15 pm
Sample Location: Station 17+86
Fly Ash: TmcLrricket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambiem Range: gO°F
Fine Aggregate: Concrete Range: °F
Slump Range (inches): 3tA
Admixtures: Weather Condhions: Clear
l Time Started: 6:45 am
2 Time Completed: 5:00 pm
Added Water: Sample Air Content ~'/~): No test
Total Cubic Yards Placed: 450.0
Required Strength (Lbs.;sq.in.): 3,000
sp~ehrs~. ?~.tea.nu~l Age Date Total Loud Ccnnpmssix'e St~nglh R¢..'nark.q
N~r Sl~ar, p; i~.: , Days: T~t~d iLb~. ! ~Lbs.. Sa. In. !
ECM 51 3½ 7 10/12/94 75,660 2,680
ECM 52 3½ 7 10/12/94 76,280 2,700
ECM 53 3½ 28 11/02/94
ECM 54 3½ 28 11/02/94
Tes~ Methods Utilized Ftactu~ Re.gu[ar Cylinders Made By: P. $.
A.$~'~'.t C-31.C-39. C-143 :L'r-e~ N¢,te~ O'..h~?~.i~e! ' ' '
Remarks and/or Distribution:
Bill Anderson- Dowdy, Anderson and Associates. Inc.
GKE ~onsultants, Inc. Reviewed by:
All Ictt~?s and mporm am foe th~ cxciusi~.~ u~ of ,be clkm to v, hoe, :.~y aM -,~dms.n~ and shall not be reproduced ~.-i'.hout ~ b.~l appt~'al of GEE Consult,mu, Inc. ~,'~ u.~ cf ora° nam~ must ~ceR~
our price w6.,.ten egg, royal. Om' !ct~:rs and mpor. s ,,ppi_'.' only to ~ne sample ~st~d ar, cl.'or Lnspec',ed ,end am ~ re~e. ssa~.ly hndicatlx'~ of ~ quantitle~ of a~.--n~mnt:.',' ~'Jentlcai or sim. Hat p.,odu~.