Loading...
Cambridge Phase 1-LR 941013 (4)I G EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane · Suite 10g · Dallas, Texas 75229 · (214) 620-9791 · Fax :214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: October 13, 1994 Date Concrete Placed: October 5, 1994 Standard 6"x12" Client: Beamer Development Corporation Area ~$._7 Square Inches Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 16 Contractor: Site Concrete Concrete Supplier and Plant: Site Concrete/On-Site Location of Placement: Castle Creek Drive Pavement MATERIALS so=o:.- sso s.tch w~. INSPECTION DATA Dcsc6.m~on (L~-CuYd) Mix Number: Time Sample Batched: [0:50 am Cement: 5 sk Time Sampled: 11:00 am Fly Ash: Sample Location: Station l-r00 Truck, Ticket No: #20 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 80°F Fine Aggregate: Concrete Range: °F Admixtures: Slump Range (inches): 2V: Weather Conditions: Clear I Time Started: 6:45 am 2 Time Completed: 5:00 pm Added Wats-r: Sample Air Content (%): No test Total Cubic Yards Placed: 300.0 Required Strength (Lbs./sq.in.): 3.000 Spc~-L.,rL-n Mcuu:cd Age Dam To~a~ Load Cotr4nc~siv¢ Strcn&th Ren-~r~ Ntac. ber SI 'UL-~. -in.) ."Daysl Tcabxt (Lbe.; ;Lba. 'Sq.ln., ECM 47 2½ 7 10/12/94 81,540 2,880 ECM 48 2% 7 10/12/94 55,540 1,960 ECM 49 2½ 28 11/02/94 ECM 50 2% 28 11/02/94 Test ,Mc~:~a t'ti~ized Fracture Rcguh; ASTM C-3hC-39.C-l-a3 L'nicss Noted O'.h~.~.s~; Cylinders Made By: P. M. Remarks and:'or Distribution: cc: Bill Anderson - Dowdy, Anderson and 'Associates. Inc. Larry Davis - City of Coppell gEE Consultants, Inc. Reviewed by: All ~t~rs and reports ,tm for Ca= cxc~'~iv= use of ~ clX.-/to v. hom '.bey am add. ms,sod and shail net be .-cproduced wztZ'~m ~ full apprevai of GEE C;nxsultams. Inc. T,'~ .u= c,f out na.,ne must our prior written approval Out letters and reports apply crdy !o G'= ~am~?;¢ ~-sted and:or imW~.-g:d an~ are not ,qe~csgatl;y indic-at~ of Ih= quan',ki~ of apvanzntiy ~dcntical or sh~ilur pro~ucls.