Loading...
Cambridge Phase 1-LR 941013 (5)GEOTECHNICAL E GEE Consultants Inc. ! 2540 Glenda kane · Suite 10g · Dallas, Texas 75229 · (214! 620-9791 · Fax ~214i 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: October 13, 1994 Date Concrete Placed: October 5, 1994 Standard 6"x12' Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I · Concrcte ReponNo.: 15 Contractor: Site Concrete Concrete Supplier and Plant: Site Concrete/On-Site Location ofPlacemem: Castle Creek Drive Pavement MATERIALS s~,~.- ss~ Sa,~ w~,. r~p,~, ,L~,:c.~vd, INSPECTION DATA Mix Number: Time Sample Batched: 9:00 am Cement: 5 sk Time Sampled: 9:15 am Fly Ash: Sample Location: Station 5 +60 Tmck.'Tic ket No: #20 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 75°F Fine Aggregate: Concrete Range: °F Admixtures: Slump Range ,.'.inches): 1 Weather Conditions: Clear I Time Started: 6:45 am 2 Time Completed: 5:00 pm Added Water: Sample Air Content (.~'}: No test Total Cubic Yards Placed: 150.0 Required Strength (I.bs ~sq in ) 3,000 Spccin~n M cas'.~x[ Age Dam Total Ltmd N m'r.l:~r $1mn~ ,in.; Days, T~ted ,Lb.: . Lbs.'Sq.ln.- ECM 43 1½ 7 10/12/94 86,700 3,070 ECM 44 1½ 7 10/12/94 90,000 3,180 ECM 45 1½ 28 11/02/94 ECM 46 1½ 28 11/02/94 Test M¢',hc~ L'tilizod Fracture Regular ASTM C-31,C-39,C->13 /L'rAess No~ Ot:~r~'is~ C.vlinders Made By: P. M. Remarks and/or Distribution: cc: Bill Anderson - Dowdy, Anderson and Associates, Inc. Larry Davis - City of Coppell G. lZ~ Consultants, Inc. Reviewed by: All k~t'.era and reports am for Om cxciusivc us~ of ~ client to ~,hom '2~.' am add~sr,~l and shall not Sc mpmd',~xl .~.'ithom '~ full a.o-~roval of GEE Cor~ultav. ts. Inc. TI~ us~ of c~r nan~ must