Loading...
Cambridge Phase 1-LR 941013 (6)I G EOTECHNICAL ENGINEERING GEE Consultants, inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214! 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: October 13, 1994 Date Concrete Placed: September ].3, ].994 Standard 6~x12'' Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 10 Contractor: Burkard Utility Contractor Concrete Supplier and Plant: Lattimore Materials Co./Plant #3 Location of Placement: Storm Drain Inlets MATERIALS ~- ~ l~scfi~ion 'Lbs C~Vd INSPECTION DATA Mix Number: 38 Time Sample Batched: 12:43 pm Cement: 5 sk Time Sampled: !:40 pm Sample Location: Inlet E side of Cambridge Manor Ln. N end Fly Ash: Tru¢l~"Ficket No: 300:'3006203 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 88°F Fine Aggregate: . Concrete Range: 86°F Admixtures: Slump Range (inches): 1 V= Weather Conditions: Partly Cloudy I W/R Time Started: 12:30 pm 2 Air Time Completed: 2:45 pm Added Water: Sample Air Content (%): No test Total Cubic Yards Placed: 8.0 Required Strength (Lbs./sq.in.): Specimen .Measured Age Dam Remarks Number SI'amp , M.' : Da~ ~ l T~ '.' L~. I - Lbs. '$,!.la. ECM 28 1½ 7 09/20/94 114,240 4,040 ECM 29 1½ 28 10/11/94 132,160 4,680 ECM 30 1½ 28 10/11/94 118,860 4,200 Te...t .%lethod$ L'~.i~izod Fractm,e Regular ASTM C-31 C-39.C-1a3 :L'."Aess Xe.~a OC~,~.i~, Cylinders Made B)': P. M. Remarks and/or Distribution: cc: Bill Anderson- Dowdy. Anderson and Associates, lin:. Larry Davis - City of Coppell GEE Consultants, Inc. Reviewed by: ..-'