Cambridge Phase 1-LR 941010I G
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax ~,214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: October 10, 1994 Date Concrete Placed: September 9 1994 Standard 6"x12"
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 9
Contractor: Burkard Utility Contractor
Concrete Supplier and Plant: Lattimore Materials Co./Plant #7
Location of Placement: Headwall (NW end near creek)
MAT ER IALS s~ ssD B.:~. w,~.
t~;.p,io~ ~L~.C~V~,: INSPECTION DATA
Mix Number: Time Sample gatched: 2:38 pm
Cement: Time Sampled: 3:39 pm
Fly Ash: Sample Location: NW near creek
Truck;Ticket No: 419/?004138
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 94°1:
1:ine Aggregate: Concrete Range: 90°I:
Admixtures: Slump Range (inches): 1
Weather Conditions: Partly Cloudy
I Time Started: 2:40 pm
2 Time Completed: 4:40 pnt
Added Water: Sample Air Content (,,%): 2,~
Total Cubic Yards Placed: 5.0
Required Strength (Lbs..:sq.in.): 3,600
Slv~'~n~n Measured Age Date Total Load Ccnnpmssiv~ Streng,&n
R~ark~
.N ~nber S'.ump :in., : I>a:, ,q Test~l ."Lbs.! L~s.
ECM 25 1½ 7 09/16/94 134,500 4,760
ECM 26 1½ 28 10/07/94 165,000 5,840
ECM 27 1½ 28 10/07/94 168,860 5,970
Test Methods Utilized Fr, tc',u:~ Regular
ASTM C-3[.C-39.C-143 :UnJess Noted O'.ber~.~: Cylinders Made By: P. M.
Remarks and:or Distribution:
Bill Anderson - Dowdy. Anderson and Associates. Inc.
Tim Yancy - Burkard Utility Contractor
GEE ~onsultnnts, Inc. Reviewed by: /
All leR~rs ami reports am for .,~ exclusive use of tbe c'~ient to whom ~ a--c ad~sscd and shall net be r~produc~xl ~.'ithout L~ f~l aM~.. 'al of GEE Com~n~. Inc. T;.q~ us~ of our name faust
our prior 'a~-itt~u approval. Out letl~ts and .%-ports apply o~y to 0~ sample ~.~sted and:or impe, cuxl ami a..~ not vt:g~ssa..iiy ;.ndicati~= of tht quantiti~ of appammly identical or shni]ar i~oducts.