Loading...
Cambridge Phase 1-LR 941004 (6)IG EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · !214} 620-9791 · Fax (214i 620-9794 GENERAL REPORT Report Date October 4, 1994 Inspection Date September 29, 1994 Client Beamer Development General Report No. 8 Project B-94-0178 Estates of Cambridge Manor, Phase I Coppell, Texas Identification Sieve Analysis of Cement Treated Pavement Subgrade Method of Test TEX- 101-E Results Actual Percent Specifications Passing Minimum Percent Passing 13/~ 3,/~ 13,~ 3A Location Sieve Sieve Sieve Sieve Cambridge Manor Lane Station 0+00 100 100 100 75 Cambridge Manor Lane Station 3 +00 100 100 100 75 Technician: G.H. Note: Above test results meet specification requirements cc: Mr. Bill Anderson - Dowdy, Anderson and Associates Mr. Larry Davis - City of Coppell ~ ~ ~....~