Cambridge Phase 1-LR 941004 (6)IG EOTECHNICAL
E GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · !214} 620-9791 · Fax (214i 620-9794
GENERAL REPORT
Report Date October 4, 1994 Inspection Date September 29, 1994
Client Beamer Development General Report No. 8
Project B-94-0178
Estates of Cambridge Manor, Phase I
Coppell, Texas
Identification Sieve Analysis of Cement Treated Pavement Subgrade
Method of Test TEX- 101-E
Results
Actual
Percent Specifications
Passing Minimum Percent Passing
13/~ 3,/~ 13,~ 3A
Location Sieve Sieve Sieve Sieve
Cambridge Manor Lane
Station 0+00 100 100 100 75
Cambridge Manor Lane
Station 3 +00 100 100 100 75
Technician: G.H.
Note: Above test results meet specification requirements
cc: Mr. Bill Anderson - Dowdy, Anderson and Associates
Mr. Larry Davis - City of Coppell ~ ~ ~....~