Cambridge Phase 1-LR 941004 (7)I G EOTECHNICAL
E GEE Consultants, Inc.
2540 Glenda lane · Suite 10g · Dallas, Texas 75229 · !.214~ 620-9791 · Fax f214~ 620-9794
GENERAL REPORT
Report Date October 4, 1994 Inspectioa Date September 30, 1994
Client Beamer Development General Report No. 7
Project B-94-0178
Estates of Cambridge Manor, Phase I
Coppell, Texas
Identification Sieve Analysis of Road Mixed Materials (lime treated)
Method of Test TEX-101-E Page 1 of 2
Results
Actual NCTCOG
Percent Specifications
Passin~ Minimum Percent Passing
I~A #4 l~/.i #4
Location Sieve Sieve Sieve Sieve
Cambridge Manor Lane
Station 5 + 50 100 74.4 100 60
Cambridge Manor Lane
Station 8 +76 100 60.0 100 60
Prince Edwards Lane
Station 0+50 100 63.7 100 60
Cambridge Manor Lane
Station 124- 00 100 60.3 100 60
Cambridge Manor 'Lane
Station 14-4- 36 100 64.6 100 60
Cambridge Manor Lane
Station 17 + 65 I00 61.0 I00 60
GEE Consultants, Inc.
Dallas, Texas
(214) 620-9791
GENERAL REPORT
Report Date October 4, 1994 Inspection Date September 30, 1994
Client Beamer Development General Report No. 7
Project B-94-0178
Estates of Cambridge Manor, Phase I
Coppeil, Texas
Identification Sieve Analysis of Road Mixed Materials (lime treated)
Method of Test TEX-101-E Paee 2 of 2
Castle Creek Drive
Station 1 +50 100 70.4 112)0 60
Castle Creek Drive
Station 4+65 100 63.2 100 60
Castle Creek Drive
Station 8 + 50 100 63. I 100 60
Kings Canyon Street
Station 3 +00 I00 60.2 100 60
Kings Canyon Street
Station 1 +50 100 65.6 100 60
Above Test Results Meet Specification Requirements
cc: Bill Anderson - Dowdy, Anderson and Associates, Inc.
Larry. Davis - City of Coppell
Tim Yancy - Burkard Utility Contractor