Loading...
Cambridge Phase 1-LR 941004 (7)I G EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda lane · Suite 10g · Dallas, Texas 75229 · !.214~ 620-9791 · Fax f214~ 620-9794 GENERAL REPORT Report Date October 4, 1994 Inspectioa Date September 30, 1994 Client Beamer Development General Report No. 7 Project B-94-0178 Estates of Cambridge Manor, Phase I Coppell, Texas Identification Sieve Analysis of Road Mixed Materials (lime treated) Method of Test TEX-101-E Page 1 of 2 Results Actual NCTCOG Percent Specifications Passin~ Minimum Percent Passing I~A #4 l~/.i #4 Location Sieve Sieve Sieve Sieve Cambridge Manor Lane Station 5 + 50 100 74.4 100 60 Cambridge Manor Lane Station 8 +76 100 60.0 100 60 Prince Edwards Lane Station 0+50 100 63.7 100 60 Cambridge Manor Lane Station 124- 00 100 60.3 100 60 Cambridge Manor 'Lane Station 14-4- 36 100 64.6 100 60 Cambridge Manor Lane Station 17 + 65 I00 61.0 I00 60 GEE Consultants, Inc. Dallas, Texas (214) 620-9791 GENERAL REPORT Report Date October 4, 1994 Inspection Date September 30, 1994 Client Beamer Development General Report No. 7 Project B-94-0178 Estates of Cambridge Manor, Phase I Coppeil, Texas Identification Sieve Analysis of Road Mixed Materials (lime treated) Method of Test TEX-101-E Paee 2 of 2 Castle Creek Drive Station 1 +50 100 70.4 112)0 60 Castle Creek Drive Station 4+65 100 63.2 100 60 Castle Creek Drive Station 8 + 50 100 63. I 100 60 Kings Canyon Street Station 3 +00 I00 60.2 100 60 Kings Canyon Street Station 1 +50 100 65.6 100 60 Above Test Results Meet Specification Requirements cc: Bill Anderson - Dowdy, Anderson and Associates, Inc. Larry. Davis - City of Coppell Tim Yancy - Burkard Utility Contractor