Cambridge Phase 1-LR 941004 (8)I G EOTECHNICAL
ENGINEERING GEE Consultants, Inc.
2540 Glenda Lane · Suite 10g · Dallas. Texas 75229 · {214) 620-9791 · Fax (214~ 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: October 4, 1994 Date Concrete Placed: September 21, 1994 Standard 6"x12'
Client: Beamer Development Corporation Area!8.!7 Square Inches
Project: Estates of Cambridge Manor, Phase I Conerete ReportNo.: 14
Contractor: Griffith Construction
Concrete Supplier and Plant: Lattimore Materials Co./Plant #3
Location of Placement: Inlet (sidewalk) and Base
sM.' ssD s.,c~ w~.. INSPECTION DATA
MAT E R I AL S
Mix Number: 38 Time Sample Batched: 3:09 pm
Cement: 5 sk Time Sampled: 3:45 pm
Sample Location: N side inlet ~ Station 3+50 sidewalk
Fly Ash: Truck,.'ricket No: 456:3006466
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: °F
Fine A~gregat¢: Concrete Range: °F
~ Slump Range (inches): 4L
Admixtures: Weather Conditions: Partly Cloudy
I Air Time Started: 3:10 pm
2 Time Completed: 4:25 pm
Added Water: 5 gallons Sample Air Content (,~): No test
Total Cubic Yards Placed: 6.0
Required Strength (Lbs./sq.in.): N,"A
Spe~.r~:n Me. astm::d Age Date Total Load Comp. _~ssiv~ Stt~.g,.h R~.marks
Ntenbct S:.,.m~.-- ,.in.i!Days) Tested iL~.: :Lb~. Sq..La.!
ECM 40 4½ 7 09/28/94 120,140 4,250
ECM 41 4½ 28 10/19/94
ECM 42 4½ 28 10/19/94
Test Me'A~ls k t;.!iz~ Fracture Regular Cv[inders Made By: K. Mc.
A~T.%t C-3l.C-39.C-la3 ~t.:rAess Nc~d O'Jr~rv,-,s~) -
Remarks and;or Distribution:
cc: Bill Anderson - Dowdy, Anderson and Associates. Inc.
Lany Davis - City of Coppell
Tim Yancy - Burkard Utility Contractor
gEE Consultants, Inc. Review~ by: ~'~
All t,'tgrs and r~,cnu am for ~ ¢x¢iusivc usc of tl~ client to whom ~ ~u~ ackite, s~d and shall nm be ~ v. ithcmt thc full app~n-al of GEE Comultants. ~. Th~ u~ of our narez: must
om' prior ~vrittma apl~o~l. Our Iet~rs and ~ports apply (rely to ~ sampi~ tes~t ~ld.'or irmlX~t~d and ar~ not necessarily indicative of tl~ quamitle~ of agTa~ntiy identical or similar pvoducm.