Cambridge Phase 1-LR 940930G EOTECHNICAL
ENGINEERING GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · {214i 620-9791 · Fax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Repoa Date: September 30, 1994 Date Concrete Placed: August 31 1994 Standard 6"x12'
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete ReportNo.: 8
Contractor: Burkard Utility Contractor
Concrete Supplier and Plant: Lattimore Materials Co./Plant #3
Location of Placement: Manhole
~= ssD ~,e~w,~. INSPECTION DATA
MATERIALS ~
Mix Number: 42 Time Sample Batched: 1:53 pm
Cement: Time Sampled: 3:05 pm
Sample Location: Manhole at NE corner of site
Fly Ash: Truck,q'icket No: 300:3005927
Coarse Aggregate: Temperatu~:
Intermediate Aggregate: Ambient Range: 94¢F
Fine Aggregate: Concrete Range: 89°F
Slump Range (inches): 1
Admixtures: Weather Conditions: Partly Cloudy
I W:R Time Started: 2:10 pm
2 Air Time Completed: 3:40 pm
Added Water: Sample Air Content (%-): No test
Total Cubic Yards Placed: 9
Required Strength (Lbs./sq.in.): 3,600
Sm Measured Age Date Tc~al Load Compmssb.~ St~ng~ Rerrraraa
N ~-nhe:r S ;;--n.p iin. i ,Da.~ s: T~uxl ~ Lb~s.; :Lbs..Sq.la.:
ECM 22 1½ 7 09/07/94 149,980 5,310
ECM 23 1½ 28 09/28/94 195,760 6,920
ECM 24 1½ 28 09/28/94 192,080 6,790
T~ Methyls L'61iz~i Fr~.ur~ Reguia~ Cvlind,;r~ Made By: R. G.
ASTM C-31.C-39. C-:-13 'Enacts N .~.ed O'A~rw~, - -
Remarks and;or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates. Inc.
Larry Davis - City of Coppeil
Tim Yancy - Burkard Utility Contractor
Gi~ Consultants, Inc. Reviewed by: ,~~ //~
Ail k:t~:vs a.~ mpox'.s am .tot th~ axcksiv~ vs~ of '..h~ ciient to whom ~ey am addressed ami shall r~ b~ mprcd, uc~d w~thout tim full ag~o'.'al of GEE Consultan'..s. l~c. Th~ ~ of our hang musl our pti. or written a..~%~ova;. Out !otb:rs and ~:por~ apply ~niy to ~ sampic le. stod and;or impc,g'.od ~ arc ,-Jot tr.,~casari.'.y -5~licatix~ of th: quami'.ic$ e( a.,.epa~raly identical or similar